Teilenummer
Hier finden Sie die Teilenummern
zu dem gesuchten Artikel
Teilenummer
|
---|
SN-TSC-HEM4R6-[26-42/1]-21 |
SN-TSC-HEM4R6.5-[28-46/1]-23 |
SN-TSC-HEM4R7-[29-36/1]-24 |
SN-TSC-HEM4R7.5-[29-36/1]-24 |
SN-TSC-HEM4R8-[31-51/1]-26 |
SN-TSC-HEM4R9-[31-50/1]-26 |
SN-TSC-HEM4R10-[39-60/1]-34 |
SN-TSC-HEM4R12-[43-70/1]-38 |
SN-TSC-HEM4R16-[58-78/1]-48 |
SN-TSC-HEM4R20-[66-92/1]-56 |
SN-TSC-HPEM4R6-[26-42/1]-21 |
SN-TSC-HPEM4R6.5-[28-46/1]-23 |
SN-TSC-HPEM4R7-[29-36/1]-24 |
SN-TSC-HPEM4R7.5-[29-36/1]-24 |
SN-TSC-HPEM4R8-[31-51/1]-26 |
SN-TSC-HPEM4R10-[39-60/1]-34 |
SN-TSC-HPEM4R12-[43-70/1]-38 |
SN-TSC-HPEM4R16-[58-78/1]-48 |
SN-TSC-HPEM4R20-[66-92/1]-56 |
SNR-TSC-HEM4R6-[26-42/1]-[5-21/1] |
SNR-TSC-HEM4R6.5-[28-46/1]-[5-23/1] |
SNR-TSC-HEM4R7-[29-36/1]-[5-24/1] |
SNR-TSC-HEM4R7.5-[29-36/1]-[5-24/1] |
SNR-TSC-HEM4R8-[31-51/1]-[5-26/1] |
SNR-TSC-HEM4R9-[31-50/1]-[5-26/1] |
SNR-TSC-HEM4R10-[39-60/1]-[5-34/1] |
SNR-TSC-HEM4R12-[43-70/1]-[5-38/1] |
SNR-TSC-HEM4R16-[53-78/1]-[5-48/1] |
SNR-TSC-HEM4R20-[61-92/1]-[5-56/1] |
SNR-TSC-HPEM4R6-[26-42/1]-[5-21/1] |
SNR-TSC-HPEM4R7-[29-36/1]-[5-24/1] |
SNR-TSC-HPEM4R7.5-[29-36/1]-[5-24/1] |
SNR-TSC-HPEM4R8-[31-51/1]-[5-26/1] |
SNR-TSC-HPEM4R10-[39-60/1]-[5-34/1] |
SNR-TSC-HPEM4R12-[43-70/1]-[5-38/1] |
SNR-TSC-HPEM4R16-[53-78/1]-[5-48/1] |
SNR-TSC-HPEM4R20-[61-92/1]-[5-56/1] |
TSC-HEM4R1 |
TSC-HEM4R1.5 |
TSC-HEM4R1.8 |
TSC-HEM4R2 |
TSC-HEM4R2.5 |
TSC-HEM4R2.8 |
TSC-HEM4R3 |
TSC-HEM4R3.5 |
TSC-HEM4R4 |
TSC-HEM4R4.5 |
TSC-HEM4R5 |
TSC-HEM4R5.5 |
TSC-HEM4R6 |
TSC-HEM4R6.5 |
TSC-HEM4R7 |
TSC-HEM4R7.5 |
TSC-HEM4R8 |
TSC-HEM4R9 |
TSC-HEM4R10 |
TSC-HEM4R12 |
TSC-HEM4R16 |
TSC-HEM4R20 |
TSC-HPEM4R1 |
Teilenummer |
Standard-Stückpreis
| Mindestbestellmenge | Mengenrabatt | Outer Diameter (D) (φ) | Flute Length (ℓ) (mm) | Shank Diameter (d) (mm) | Overall Length (L) (mm) | Length Under Neck (ℓ1) (mm) | Geometry | Additional Classification | Figure | ● Inventory Product □ Manufacturer Product | |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
- | 1 | 8 Arbeitstage | 6 | 21 | 6 | 60 | 26 ~ 42 | Mit Führung | Standard Neck Relief | 2 | □ | ||
- | 1 | 8 Arbeitstage | 6.5 | 23 | 8 | 70 | 28 ~ 46 | Mit Führung | Standard Neck Relief | 1 | □ | ||
- | 1 | 8 Arbeitstage | 7 | 24 | 8 | 60 | 29 ~ 36 | Mit Führung | Standard Neck Relief | 1 | □ | ||
- | 1 | 8 Arbeitstage | 7.5 | 24 | 8 | 60 | 29 ~ 36 | Mit Führung | Standard Neck Relief | 1 | □ | ||
- | 1 | 8 Arbeitstage | 8 | 26 | 8 | 75 | 31 ~ 51 | Mit Führung | Standard Neck Relief | 2 | □ | ||
- | 1 | 8 Arbeitstage | 9 | 26 | 10 | 80 | 31 ~ 50 | Mit Führung | Standard Neck Relief | 1 | □ | ||
- | 1 | 8 Arbeitstage | 10 | 34 | 10 | 90 | 39 ~ 60 | Mit Führung | Standard Neck Relief | 2 | □ | ||
- | 1 | 8 Arbeitstage | 12 | 38 | 12 | 100 | 43 ~ 70 | Mit Führung | Standard Neck Relief | 2 | □ | ||
- | 1 | 8 Arbeitstage | 16 | 48 | 16 | 110 | 58 ~ 78 | Mit Führung | Standard Neck Relief | 2 | □ | ||
- | 1 | 8 Arbeitstage | 20 | 56 | 20 | 130 | 66 ~ 92 | Mit Führung | Standard Neck Relief | 2 | □ | ||
- | 1 | 8 Arbeitstage | 6 | 21 | 6 | 60 | 26 ~ 42 | Sharp Corner | Standard Neck Relief | 2 | □ | ||
- | 1 | 8 Arbeitstage | 6.5 | 23 | 8 | 70 | 28 ~ 46 | Sharp Corner | Standard Neck Relief | 1 | □ | ||
- | 1 | 8 Arbeitstage | 7 | 24 | 8 | 60 | 29 ~ 36 | Sharp Corner | Standard Neck Relief | 1 | □ | ||
- | 1 | 8 Arbeitstage | 7.5 | 24 | 8 | 60 | 29 ~ 36 | Sharp Corner | Standard Neck Relief | 1 | □ | ||
- | 1 | 8 Arbeitstage | 8 | 26 | 8 | 75 | 31 ~ 51 | Sharp Corner | Standard Neck Relief | 2 | □ | ||
- | 1 | 8 Arbeitstage | 10 | 34 | 10 | 90 | 39 ~ 60 | Sharp Corner | Standard Neck Relief | 2 | □ | ||
- | 1 | 8 Arbeitstage | 12 | 38 | 12 | 100 | 43 ~ 70 | Sharp Corner | Standard Neck Relief | 2 | □ | ||
- | 1 | 8 Arbeitstage | 16 | 48 | 16 | 110 | 58 ~ 78 | Sharp Corner | Standard Neck Relief | 2 | □ | ||
- | 1 | 8 Arbeitstage | 20 | 56 | 20 | 130 | 66 ~ 92 | Sharp Corner | Standard Neck Relief | 2 | □ | ||
- | 1 | 7 Arbeitstage | 6 | 21 | 6 | 60 | 26 ~ 42 | Mit Führung | Cutting Edge R Processing | 2 | □ | ||
- | 1 | 7 Arbeitstage | 6.5 | 23 | 8 | 70 | 28 ~ 46 | Mit Führung | Cutting Edge R Processing | 1 | □ | ||
- | 1 | 7 Arbeitstage | 7 | 24 | 8 | 60 | 29 ~ 36 | Mit Führung | Cutting Edge R Processing | 1 | □ | ||
- | 1 | 7 Arbeitstage | 7.5 | 24 | 8 | 60 | 29 ~ 36 | Mit Führung | Cutting Edge R Processing | 1 | □ | ||
- | 1 | 7 Arbeitstage | 8 | 26 | 8 | 75 | 31 ~ 51 | Mit Führung | Cutting Edge R Processing | 2 | □ | ||
- | 1 | 7 Arbeitstage | 9 | 26 | 10 | 80 | 31 ~ 50 | Mit Führung | Cutting Edge R Processing | 1 | □ | ||
- | 1 | 7 Arbeitstage | 10 | 34 | 10 | 90 | 39 ~ 60 | Mit Führung | Cutting Edge R Processing | 2 | □ | ||
- | 1 | 7 Arbeitstage | 12 | 38 | 12 | 100 | 43 ~ 70 | Mit Führung | Cutting Edge R Processing | 2 | □ | ||
- | 1 | 7 Arbeitstage | 16 | 48 | 16 | 110 | 53 ~ 78 | Mit Führung | Cutting Edge R Processing | 2 | □ | ||
- | 1 | 7 Arbeitstage | 20 | 56 | 20 | 130 | 61 ~ 92 | Mit Führung | Cutting Edge R Processing | 2 | □ | ||
- | 1 | 7 Arbeitstage | 6 | 21 | 6 | 60 | 26 ~ 42 | Sharp Corner | Cutting Edge R Processing | 2 | □ | ||
- | 1 | 7 Arbeitstage | 7 | 24 | 8 | 60 | 29 ~ 36 | Sharp Corner | Cutting Edge R Processing | 1 | □ | ||
- | 1 | 7 Arbeitstage | 7.5 | 24 | 8 | 60 | 29 ~ 36 | Sharp Corner | Cutting Edge R Processing | 1 | □ | ||
- | 1 | 7 Arbeitstage | 8 | 26 | 8 | 75 | 31 ~ 51 | Sharp Corner | Cutting Edge R Processing | 2 | □ | ||
- | 1 | 7 Arbeitstage | 10 | 34 | 10 | 90 | 39 ~ 60 | Sharp Corner | Cutting Edge R Processing | 2 | □ | ||
- | 1 | 7 Arbeitstage | 12 | 38 | 12 | 100 | 43 ~ 70 | Sharp Corner | Cutting Edge R Processing | 2 | □ | ||
- | 1 | 7 Arbeitstage | 16 | 48 | 16 | 110 | 53 ~ 78 | Sharp Corner | Cutting Edge R Processing | 2 | □ | ||
- | 1 | 7 Arbeitstage | 20 | 56 | 20 | 130 | 61 ~ 92 | Sharp Corner | Cutting Edge R Processing | 2 | □ | ||
44.71 € | 1 | Verfügbar | 5 Arbeitstage | 1 | 4 | 6 | 60 | - | Mit Führung | Stocked Product | 1 | ● | |
44.53 € | 1 | Verfügbar | 5 Arbeitstage | 1.5 | 6 | 6 | 60 | - | Mit Führung | Stocked Product | 1 | ● | |
47.20 € | 1 | Verfügbar | 5 Arbeitstage | 1.8 | 7 | 6 | 60 | - | Mit Führung | Stocked Product | 1 | ● | |
29.59 € | 1 | Verfügbar | 5 Arbeitstage | 2 | 8 | 6 | 60 | - | Mit Führung | Stocked Product | 1 | ● | |
33.14 € | 1 | Verfügbar | 5 Arbeitstage | 2.5 | 10 | 6 | 60 | - | Mit Führung | Stocked Product | 1 | ● | |
48.87 € | 1 | Verfügbar | 5 Arbeitstage | 2.8 | 13 | 6 | 60 | - | Mit Führung | Stocked Product | 1 | ● | |
31.60 € | 1 | Verfügbar | 5 Arbeitstage | 3 | 16 | 6 | 60 | - | Mit Führung | Stocked Product | 1 | ● | |
34.29 € | 1 | Verfügbar | 5 Arbeitstage | 3.5 | 18 | 6 | 60 | - | Mit Führung | Stocked Product | 1 | ● | |
37.87 € | 1 | Verfügbar | 5 Arbeitstage | 4 | 18 | 6 | 60 | - | Mit Führung | Stocked Product | 1 | ● | |
49.42 € | 1 | Verfügbar | 5 Arbeitstage | 4.5 | 19 | 6 | 60 | - | Mit Führung | Stocked Product | 1 | ● | |
42.05 € | 1 | Verfügbar | 5 Arbeitstage | 5 | 21 | 6 | 60 | - | Mit Führung | Stocked Product | 1 | ● | |
71.78 € | 1 | Verfügbar | 5 Arbeitstage | 5.5 | 21 | 6 | 60 | - | Mit Führung | Stocked Product | 1 | ● | |
43.56 € | 1 | Verfügbar | 5 Arbeitstage | 6 | 21 | 6 | 60 | - | Mit Führung | Stocked Product | 2 | ● | |
118.43 € | 1 | Verfügbar | 5 Arbeitstage | 6.5 | 23 | 8 | 70 | - | Mit Führung | Stocked Product | 1 | ● | |
54.00 € | 1 | Verfügbar | 5 Arbeitstage | 7 | 24 | 8 | 60 | - | Mit Führung | Stocked Product | 1 | ● | |
75.24 € | 1 | Verfügbar | 5 Arbeitstage | 7.5 | 24 | 8 | 60 | - | Mit Führung | Stocked Product | 1 | ● | |
55.87 € | 1 | Verfügbar | 5 Arbeitstage | 8 | 26 | 8 | 75 | - | Mit Führung | Stocked Product | 2 | ● | |
70.63 € | 1 | Verfügbar | 5 Arbeitstage | 9 | 26 | 10 | 80 | - | Mit Führung | Stocked Product | 1 | ● | |
85.22 € | 1 | Verfügbar | 5 Arbeitstage | 10 | 34 | 10 | 90 | - | Mit Führung | Stocked Product | 2 | ● | |
108.02 € | 1 | Verfügbar | 5 Arbeitstage | 12 | 38 | 12 | 100 | - | Mit Führung | Stocked Product | 2 | ● | |
144.76 € | 1 | Verfügbar | 5 Arbeitstage | 16 | 48 | 16 | 110 | - | Mit Führung | Stocked Product | 2 | ● | |
224.73 € | 1 | Verfügbar | 5 Arbeitstage | 20 | 56 | 20 | 130 | - | Mit Führung | Stocked Product | 2 | ● | |
43.76 € | 1 | Verfügbar | 5 Arbeitstage | 1 | 4 | 6 | 60 | - | Sharp Corner | Stocked Product | 1 | ● |
Loading...
Model Number | Flute Length ℓ |
Overall Length L |
Shank Diameter d |
Figure | |
Outer Diameter D |
|||||
TSC-HEM4R (Standard) TSC-HPEM4R (Sharp Edge) |
1 | 4 | 60 | 6 | 1 |
1.5 | 6 | 60 | 6 | 1 | |
1.8 | 7 | 60 | 6 | 1 | |
2 | 8 | 60 | 6 | 1 | |
2.5 | 10 | 60 | 6 | 1 | |
2.8 | 13 | 60 | 6 | 1 | |
3 | 16 | 60 | 6 | 1 | |
3.5 | 18 | 60 | 6 | 1 | |
4 | 18 | 60 | 6 | 1 | |
4.5 | 19 | 60 | 6 | 1 | |
5 | 21 | 60 | 6 | 1 | |
5.5 | 21 | 60 | 6 | 1 | |
6 | 21 | 60 | 6 | 2 | |
6.5 | 23 | 70 | 8 | 1 | |
7 | 24 | 60 | 8 | 1 | |
7.5 | 24 | 60 | 8 | 1 | |
8 | 26 | 75 | 8 | 2 | |
9 | 26 | 80 | 10 | 1 | |
10 | 34 | 90 | 10 | 2 | |
12 | 38 | 100 | 12 | 2 | |
16 | 48 | 110 | 16 | 2 | |
20 | 56 | 130 | 20 | 2 |
For Cutting Conditions, Refer to >>Click here.
● It has a TS film coating with much greater oxidation resistance and hardness than conventional films, resulting in a longer operational life and ideal for high speed machining / dry machining.
● The unique tip pocket shape allows for the cutting of grooves to be achieved with 2 flutes in parallel at the cutting depth.
● Compared to 30° twisted square end mills, both rotation and feed capacity are more than double for higher speed machining.
Work Material | General Steel / Heat-Treated Steel / High-Hardness Steel ~ HRC55 / Edelstahl / Gusseisen / Aluminum Alloy / Copper Alloy | Number of Flutes(sheet) | 4 | Model | Quadratisch |
---|---|---|---|---|---|
Coating | For High Hardness (Silicone-Based) | Processing Applications | Flat Surface / Side Surface / Inclined Cutting | Torsion Angle (θ) | Powerful Helix (45° to 60°) |
Tolerance of OD(mm) | 0 ~ -0.02 |
Konfigurieren
Basiseigenschaften
Outer Diameter (D)(φ)
Flute Length (ℓ)(mm)
Shank Diameter (d)(mm)
Overall Length (L)(mm)
Length Under Neck (ℓ1)(mm)
Geometry
Additional Classification
Ausführung
Filtern nach vsl. Lieferzeit
Optionale Eigenschaften