Achieves excellent durability and a switch can be included. Rotary actuator with wide range of torque sizes and vane types.
Teilenummer
Hier finden Sie die Teilenummern
zu dem gesuchten Artikel
Teilenummer |
---|
RV3D1-90-45 |
RV3D1-90-45-[FA,LS] |
RV3D1-90-45-S |
RV3D1-90-45-S[FA,LS] |
RV3D3-90-45 |
RV3D3-90-45-[FA,LS] |
RV3D3-90-45-S |
RV3D3-90-45-S[FA,LS] |
RV3D3-90-45-[SR,SR-U] |
RV3D3-90-45-[SR,SR-U]-[FA,LS] |
RV3D10-90-45 |
RV3D10-90-45-[FA,LS] |
RV3D10-90-45-S |
RV3D10-90-45-S[FA,LS] |
RV3D10-90-45-[SR,SR-U] |
RV3D10-90-45-[SR,SR-U]-[FA,LS] |
RV3D20-90-45 |
RV3D20-90-45-[FA,LS] |
RV3D20-90-45-S |
RV3D20-90-45-S[FA,LS] |
RV3D20-90-45-[SR,SR-U] |
RV3D20-90-45-[SR,SR-U]-[FA,LS] |
RV3D30-90-45 |
RV3D30-90-45-[FA,LS] |
RV3D30-90-45-[SR,SR-U] |
RV3D30-90-45-[SR,SR-U]-[FA,LS] |
RV3DA3-0-45 |
RV3DA3-0-45-[FA,LS] |
RV3DA3-0-45-[FA,LS]K |
RV3DA3-0-45-K |
RV3DA3-0-45-[FR,FR-U] |
RV3DA3-0-45-[FR,FR-U]-[FA,LS] |
RV3DA3-[30-90/5]-45 |
RV3DA3-[30-90/5]-45-[FA,LS] |
RV3DA3-[30-90/5]-45-[FA,LS]K |
RV3DA3-[30-90/5]-45-K |
RV3DA3-[30-90/5]-45-[FR,FR-U] |
RV3DA3-[30-90/5]-45-[FR,FR-U]-[FA,LS] |
RV3DA10-0-45 |
RV3DA10-0-45-[FA,LS] |
RV3DA10-0-45-[FA,LS]K |
RV3DA10-0-45-K |
RV3DA10-0-45-[FR,FR-U] |
RV3DA10-0-45-[FR,FR-U]-[FA,LS] |
RV3DA10-[30-90/5]-45 |
RV3DA10-[30-90/5]-45-[FA,LS] |
RV3DA10-[30-90/5]-45-[FA,LS]K |
RV3DA10-[30-90/5]-45-K |
RV3DA10-[30-90/5]-45-[FR,FR-U] |
RV3DA10-[30-90/5]-45-[FR,FR-U]-[FA,LS] |
RV3DA20-0-45 |
RV3DA20-0-45-[FA,LS] |
RV3DA20-0-45-[FA,LS]K |
RV3DA20-0-45-K |
RV3DA20-0-45-[FR,FR-U] |
RV3DA20-0-45-[FR,FR-U]-[FA,LS] |
RV3DA20-[30-90/5]-45 |
RV3DA20-[30-90/5]-45-[FA,LS] |
RV3DA20-[30-90/5]-45-[FA,LS]K |
RV3DA20-[30-90/5]-45-K |
Teilenummer | Standard-Stückpreis | Mengenrabatt | Lieferzeit? | Oszillationswinkel A | Drehmoment (N・m) | Drehmoment (N・m) | Betriebsmethode | Ventil | Betriebsdruckbereich (MPa) | Anzahl der Magnetventile | Bracket | Oscillating Origin (°C) | Oscillation Angle Setting | Port Position | Protective Cover | Switch Model | Valve Voltage |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
- | 22 Arbeitstage | 90° | Unter 1 | 0.27 | Doppelte Flügel | kA | 0.2~0.7 | - | NA | 45 | - | Direction Perpendicular to Shaft | - | With no switch | - | ||
- | 22 Arbeitstage | 90° | Unter 1 | 0.27 | Doppelte Flügel | kA | 0.2~0.7 | - | Flange Shape / Foot | 45 | - | Direction Perpendicular to Shaft | - | With no switch | - | ||
- | 22 Arbeitstage | 90° | Unter 1 | 0.27 | Doppelte Flügel | kA | 0.2~0.7 | - | NA | 45 | - | Axial direction | - | With no switch | - | ||
- | 22 Arbeitstage | 90° | Unter 1 | 0.27 | Doppelte Flügel | kA | 0.2~0.7 | - | Flange Shape / Foot | 45 | - | Axial direction | - | With no switch | - | ||
- | 22 Arbeitstage | 90° | Unter 1 | 0.71 | Doppelte Flügel | kA | 0.2~0.7 | - | NA | 45 | - | Direction Perpendicular to Shaft | - | With no switch | - | ||
- | 22 Arbeitstage | 90° | Unter 1 | 0.71 | Doppelte Flügel | kA | 0.2~0.7 | - | Flange Shape / Foot | 45 | - | Direction Perpendicular to Shaft | - | With no switch | - | ||
- | 22 Arbeitstage | 90° | Unter 1 | 0.71 | Doppelte Flügel | kA | 0.2~0.7 | - | NA | 45 | - | Axial direction | - | With no switch | - | ||
- | 22 Arbeitstage | 90° | Unter 1 | 0.71 | Doppelte Flügel | kA | 0.2~0.7 | - | Flange Shape / Foot | 45 | - | Axial direction | - | With no switch | - | ||
- | 22 Arbeitstage | 90° | Unter 1 | 0.71 | Doppelte Flügel | kA | 0.2~0.7 | - | NA | 45 | - | Direction Perpendicular to Shaft | - | Lead Wire with Switch Parallel to Shaft / Lead Wire with Switch Perpendicular to Shaft | - | ||
- | 22 Arbeitstage | 90° | Unter 1 | 0.71 | Doppelte Flügel | kA | 0.2~0.7 | - | Flange Shape / Foot | 45 | - | Direction Perpendicular to Shaft | - | Lead Wire with Switch Parallel to Shaft / Lead Wire with Switch Perpendicular to Shaft | - | ||
- | 22 Arbeitstage | 90° | 1~unter 3 | 2.11 | Doppelte Flügel | kA | 0.2~0.7 | - | NA | 45 | - | Direction Perpendicular to Shaft | - | With no switch | - | ||
- | 22 Arbeitstage | 90° | 1~unter 3 | 2.11 | Doppelte Flügel | kA | 0.2~0.7 | - | Flange Shape / Foot | 45 | - | Direction Perpendicular to Shaft | - | With no switch | - | ||
- | 22 Arbeitstage | 90° | 1~unter 3 | 2.11 | Doppelte Flügel | kA | 0.2~0.7 | - | NA | 45 | - | Axial direction | - | With no switch | - | ||
- | 22 Arbeitstage | 90° | 1~unter 3 | 2.11 | Doppelte Flügel | kA | 0.2~0.7 | - | Flange Shape / Foot | 45 | - | Axial direction | - | With no switch | - | ||
- | 22 Arbeitstage | 90° | 1~unter 3 | 2.11 | Doppelte Flügel | kA | 0.2~0.7 | - | NA | 45 | - | Direction Perpendicular to Shaft | - | Lead Wire with Switch Parallel to Shaft / Lead Wire with Switch Perpendicular to Shaft | - | ||
- | 22 Arbeitstage | 90° | 1~unter 3 | 2.11 | Doppelte Flügel | kA | 0.2~0.7 | - | Flange Shape / Foot | 45 | - | Direction Perpendicular to Shaft | - | Lead Wire with Switch Parallel to Shaft / Lead Wire with Switch Perpendicular to Shaft | - | ||
- | 22 Arbeitstage | 90° | 3~unter 6 | 3.88 | Doppelte Flügel | kA | 0.2~1.0 | - | NA | 45 | - | Direction Perpendicular to Shaft | - | With no switch | - | ||
- | 22 Arbeitstage | 90° | 3~unter 6 | 3.88 | Doppelte Flügel | kA | 0.2~1.0 | - | Flange Shape / Foot | 45 | - | Direction Perpendicular to Shaft | - | With no switch | - | ||
- | 22 Arbeitstage | 90° | 3~unter 6 | 3.88 | Doppelte Flügel | kA | 0.2~1.0 | - | NA | 45 | - | Axial direction | - | With no switch | - | ||
- | 22 Arbeitstage | 90° | 3~unter 6 | 3.88 | Doppelte Flügel | kA | 0.2~1.0 | - | Flange Shape / Foot | 45 | - | Axial direction | - | With no switch | - | ||
- | 22 Arbeitstage | 90° | 3~unter 6 | 3.88 | Doppelte Flügel | kA | 0.2~1.0 | - | NA | 45 | - | Direction Perpendicular to Shaft | - | Lead Wire with Switch Parallel to Shaft / Lead Wire with Switch Perpendicular to Shaft | - | ||
- | 22 Arbeitstage | 90° | 3~unter 6 | 3.88 | Doppelte Flügel | kA | 0.2~1.0 | - | Flange Shape / Foot | 45 | - | Direction Perpendicular to Shaft | - | Lead Wire with Switch Parallel to Shaft / Lead Wire with Switch Perpendicular to Shaft | - | ||
- | 22 Arbeitstage | 90° | 6~unter 10 | 7.7 | Doppelte Flügel | kA | 0.2~1.0 | - | NA | 45 | - | Direction Perpendicular to Shaft | - | With no switch | - | ||
- | 22 Arbeitstage | 90° | 6~unter 10 | 7.7 | Doppelte Flügel | kA | 0.2~1.0 | - | Flange Shape / Foot | 45 | - | Direction Perpendicular to Shaft | - | With no switch | - | ||
- | 22 Arbeitstage | 90° | 6~unter 10 | 7.7 | Doppelte Flügel | kA | 0.2~1.0 | - | NA | 45 | - | Direction Perpendicular to Shaft | - | Lead Wire with Switch Parallel to Shaft / Lead Wire with Switch Perpendicular to Shaft | - | ||
- | 22 Arbeitstage | 90° | 6~unter 10 | 7.7 | Doppelte Flügel | kA | 0.2~1.0 | - | Flange Shape / Foot | 45 | - | Direction Perpendicular to Shaft | - | Lead Wire with Switch Parallel to Shaft / Lead Wire with Switch Perpendicular to Shaft | - | ||
- | 22 Arbeitstage | Beliebige Einstellung, Ausführung | Unter 1 | 0.71 | Doppelte Flügel | kA | 0.2~0.7 | - | NA | - | 0 | - | NA | With no switch | - | ||
- | 22 Arbeitstage | Beliebige Einstellung, Ausführung | Unter 1 | 0.71 | Doppelte Flügel | kA | 0.2~0.7 | - | Flange Shape / Foot | - | 0 | - | NA | With no switch | - | ||
- | 22 Arbeitstage | Beliebige Einstellung, Ausführung | Unter 1 | 0.71 | Doppelte Flügel | kA | 0.2~0.7 | - | Flange Shape / Foot | - | 0 | - | Available | With no switch | - | ||
- | 22 Arbeitstage | Beliebige Einstellung, Ausführung | Unter 1 | 0.71 | Doppelte Flügel | kA | 0.2~0.7 | - | NA | - | 0 | - | Available | With no switch | - | ||
- | 22 Arbeitstage | Beliebige Einstellung, Ausführung | Unter 1 | 0.71 | Doppelte Flügel | kA | 0.2~0.7 | - | NA | - | 0 | - | NA | Lead Wire with Switch Parallel to Shaft / Lead Wire with Switch Perpendicular to Shaft | - | ||
- | 22 Arbeitstage | Beliebige Einstellung, Ausführung | Unter 1 | 0.71 | Doppelte Flügel | kA | 0.2~0.7 | - | Flange Shape / Foot | - | 0 | - | NA | Lead Wire with Switch Parallel to Shaft / Lead Wire with Switch Perpendicular to Shaft | - | ||
- | 22 Arbeitstage | Beliebige Einstellung, Ausführung | Unter 1 | 0.71 | Doppelte Flügel | kA | 0.2~0.7 | - | NA | - | 30 ~ 90 | - | NA | With no switch | - | ||
- | 22 Arbeitstage | Beliebige Einstellung, Ausführung | Unter 1 | 0.71 | Doppelte Flügel | kA | 0.2~0.7 | - | Flange Shape / Foot | - | 30 ~ 90 | - | NA | With no switch | - | ||
- | 22 Arbeitstage | Beliebige Einstellung, Ausführung | Unter 1 | 0.71 | Doppelte Flügel | kA | 0.2~0.7 | - | Flange Shape / Foot | - | 30 ~ 90 | - | Available | With no switch | - | ||
- | 22 Arbeitstage | Beliebige Einstellung, Ausführung | Unter 1 | 0.71 | Doppelte Flügel | kA | 0.2~0.7 | - | NA | - | 30 ~ 90 | - | Available | With no switch | - | ||
- | 22 Arbeitstage | Beliebige Einstellung, Ausführung | Unter 1 | 0.71 | Doppelte Flügel | kA | 0.2~0.7 | - | NA | - | 30 ~ 90 | - | NA | Lead Wire with Switch Parallel to Shaft / Lead Wire with Switch Perpendicular to Shaft | - | ||
- | 22 Arbeitstage | Beliebige Einstellung, Ausführung | Unter 1 | 0.71 | Doppelte Flügel | kA | 0.2~0.7 | - | Flange Shape / Foot | - | 30 ~ 90 | - | NA | Lead Wire with Switch Parallel to Shaft / Lead Wire with Switch Perpendicular to Shaft | - | ||
- | 22 Arbeitstage | Beliebige Einstellung, Ausführung | 1~unter 3 | 2.11 | Doppelte Flügel | kA | 0.2~0.7 | - | NA | - | 0 | - | NA | With no switch | - | ||
- | 22 Arbeitstage | Beliebige Einstellung, Ausführung | 1~unter 3 | 2.11 | Doppelte Flügel | kA | 0.2~0.7 | - | Flange Shape / Foot | - | 0 | - | NA | With no switch | - | ||
- | 22 Arbeitstage | Beliebige Einstellung, Ausführung | 1~unter 3 | 2.11 | Doppelte Flügel | kA | 0.2~0.7 | - | Flange Shape / Foot | - | 0 | - | Available | With no switch | - | ||
- | 22 Arbeitstage | Beliebige Einstellung, Ausführung | 1~unter 3 | 2.11 | Doppelte Flügel | kA | 0.2~0.7 | - | NA | - | 0 | - | Available | With no switch | - | ||
- | 22 Arbeitstage | Beliebige Einstellung, Ausführung | 1~unter 3 | 2.11 | Doppelte Flügel | kA | 0.2~0.7 | - | NA | - | 0 | - | NA | Lead Wire with Switch Parallel to Shaft / Lead Wire with Switch Perpendicular to Shaft | - | ||
- | 22 Arbeitstage | Beliebige Einstellung, Ausführung | 1~unter 3 | 2.11 | Doppelte Flügel | kA | 0.2~0.7 | - | Flange Shape / Foot | - | 0 | - | NA | Lead Wire with Switch Parallel to Shaft / Lead Wire with Switch Perpendicular to Shaft | - | ||
- | 22 Arbeitstage | Beliebige Einstellung, Ausführung | 1~unter 3 | 2.11 | Doppelte Flügel | kA | 0.2~0.7 | - | NA | - | 30 ~ 90 | - | NA | With no switch | - | ||
- | 22 Arbeitstage | Beliebige Einstellung, Ausführung | 1~unter 3 | 2.11 | Doppelte Flügel | kA | 0.2~0.7 | - | Flange Shape / Foot | - | 30 ~ 90 | - | NA | With no switch | - | ||
- | 22 Arbeitstage | Beliebige Einstellung, Ausführung | 1~unter 3 | 2.11 | Doppelte Flügel | kA | 0.2~0.7 | - | Flange Shape / Foot | - | 30 ~ 90 | - | Available | With no switch | - | ||
- | 22 Arbeitstage | Beliebige Einstellung, Ausführung | 1~unter 3 | 2.11 | Doppelte Flügel | kA | 0.2~0.7 | - | NA | - | 30 ~ 90 | - | Available | With no switch | - | ||
- | 22 Arbeitstage | Beliebige Einstellung, Ausführung | 1~unter 3 | 2.11 | Doppelte Flügel | kA | 0.2~0.7 | - | NA | - | 30 ~ 90 | - | NA | Lead Wire with Switch Parallel to Shaft / Lead Wire with Switch Perpendicular to Shaft | - | ||
- | 22 Arbeitstage | Beliebige Einstellung, Ausführung | 1~unter 3 | 2.11 | Doppelte Flügel | kA | 0.2~0.7 | - | Flange Shape / Foot | - | 30 ~ 90 | - | NA | Lead Wire with Switch Parallel to Shaft / Lead Wire with Switch Perpendicular to Shaft | - | ||
- | 22 Arbeitstage | Beliebige Einstellung, Ausführung | 3~unter 6 | 3.88 | Doppelte Flügel | kA | 0.2~1.0 | - | NA | - | 0 | - | NA | With no switch | - | ||
- | 22 Arbeitstage | Beliebige Einstellung, Ausführung | 3~unter 6 | 3.88 | Doppelte Flügel | kA | 0.2~1.0 | - | Flange Shape / Foot | - | 0 | - | NA | With no switch | - | ||
- | 22 Arbeitstage | Beliebige Einstellung, Ausführung | 3~unter 6 | 3.88 | Doppelte Flügel | kA | 0.2~1.0 | - | Flange Shape / Foot | - | 0 | - | Available | With no switch | - | ||
- | 22 Arbeitstage | Beliebige Einstellung, Ausführung | 3~unter 6 | 3.88 | Doppelte Flügel | kA | 0.2~1.0 | - | NA | - | 0 | - | Available | With no switch | - | ||
- | 22 Arbeitstage | Beliebige Einstellung, Ausführung | 3~unter 6 | 3.88 | Doppelte Flügel | kA | 0.2~1.0 | - | NA | - | 0 | - | NA | Lead Wire with Switch Parallel to Shaft / Lead Wire with Switch Perpendicular to Shaft | - | ||
- | 22 Arbeitstage | Beliebige Einstellung, Ausführung | 3~unter 6 | 3.88 | Doppelte Flügel | kA | 0.2~1.0 | - | Flange Shape / Foot | - | 0 | - | NA | Lead Wire with Switch Parallel to Shaft / Lead Wire with Switch Perpendicular to Shaft | - | ||
- | 22 Arbeitstage | Beliebige Einstellung, Ausführung | 3~unter 6 | 3.88 | Doppelte Flügel | kA | 0.2~1.0 | - | NA | - | 30 ~ 90 | - | NA | With no switch | - | ||
- | 22 Arbeitstage | Beliebige Einstellung, Ausführung | 3~unter 6 | 3.88 | Doppelte Flügel | kA | 0.2~1.0 | - | Flange Shape / Foot | - | 30 ~ 90 | - | NA | With no switch | - | ||
- | 22 Arbeitstage | Beliebige Einstellung, Ausführung | 3~unter 6 | 3.88 | Doppelte Flügel | kA | 0.2~1.0 | - | Flange Shape / Foot | - | 30 ~ 90 | - | Available | With no switch | - | ||
- | 22 Arbeitstage | Beliebige Einstellung, Ausführung | 3~unter 6 | 3.88 | Doppelte Flügel | kA | 0.2~1.0 | - | NA | - | 30 ~ 90 | - | Available | With no switch | - |
Loading...
Art | Achsenausgangsleistung des Drehaktors auf einer Seite | Haupteinheits-Form | Runde Form | Umwelt, Anwendung | Standard |
---|---|---|---|---|---|
Steifigkeit, Präzision | Standard |
NIHON PISCO
Standardpreis 276.19 €
Lieferzeit: 21 Arbeitstage
SMC
Standardpreis 424.19 €
Lieferzeit: Versand am selben Tag
SMC
Standardpreis 158.50 €
Lieferzeit: Versand am selben Tag
SMC
Standardpreis 112.26 €
Lieferzeit: Versand am selben Tag
SMC
Standardpreis 118.74 €
Lieferzeit: 4 Arbeitstage
SMC
Standardpreis 134.41 €
Lieferzeit: 4 Arbeitstage
SMC
Standardpreis 223.38 €
Lieferzeit: 4 Arbeitstage
NIHON PISCO
Standardpreis 193.69 €
Lieferzeit: 21 Arbeitstage
Helfen Sie uns dabei, unsere Webseite noch weiter zu verbessern.
Bitte geben Sie uns Ihr Feedback zu unserem MISUMI e-Katalog.
Vielen Dank für Ihre Unterstützung.
Bitte nutzen Sie das Anfrageformular, wenn Sie eine umgehende Antwort von uns wünschen.