Teilenummer |
Standard-Stückpreis
| Mindestbestellmenge | Mengenrabatt | RoHS | Overall Length (m) | Conductor Cross Section (mm2) | Number Of Cores (Core) | Finished outer diameter (mm) | Mindestbiegeradius bei Betrieb (mm) | Minimaler Biegeradius, wenn befestigt (mm) | Leiterwiderstand (Ω/km) | Zulässiger Strom-Referenzwert (30 °C) (A) | |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
2,285.91 € | 1 | 6 Arbeitstage | 10 | 21 | 50 | 4 | 35 | 262.5 | 140 | 0.386 | 202 | ||
2,394.74 € | 1 | 6 Arbeitstage | 10 | 22 | 50 | 4 | 35 | 262.5 | 140 | 0.386 | 202 | ||
2,503.60 € | 1 | 6 Arbeitstage | 10 | 23 | 50 | 4 | 35 | 262.5 | 140 | 0.386 | 202 | ||
2,612.46 € | 1 | 6 Arbeitstage | 10 | 24 | 50 | 4 | 35 | 262.5 | 140 | 0.386 | 202 | ||
2,721.32 € | 1 | 6 Arbeitstage | 10 | 25 | 50 | 4 | 35 | 262.5 | 140 | 0.386 | 202 | ||
2,830.15 € | 1 | 6 Arbeitstage | 10 | 26 | 50 | 4 | 35 | 262.5 | 140 | 0.386 | 202 | ||
2,939.02 € | 1 | 6 Arbeitstage | 10 | 27 | 50 | 4 | 35 | 262.5 | 140 | 0.386 | 202 | ||
3,047.88 € | 1 | 6 Arbeitstage | 10 | 28 | 50 | 4 | 35 | 262.5 | 140 | 0.386 | 202 | ||
3,156.71 € | 1 | 6 Arbeitstage | 10 | 29 | 50 | 4 | 35 | 262.5 | 140 | 0.386 | 202 | ||
3,265.57 € | 1 | 6 Arbeitstage | 10 | 30 | 50 | 4 | 35 | 262.5 | 140 | 0.386 | 202 | ||
3,374.43 € | 1 | 6 Arbeitstage | 10 | 31 | 50 | 4 | 35 | 262.5 | 140 | 0.386 | 202 | ||
3,483.26 € | 1 | 6 Arbeitstage | 10 | 32 | 50 | 4 | 35 | 262.5 | 140 | 0.386 | 202 | ||
3,592.12 € | 1 | 6 Arbeitstage | 10 | 33 | 50 | 4 | 35 | 262.5 | 140 | 0.386 | 202 | ||
3,700.98 € | 1 | 6 Arbeitstage | 10 | 34 | 50 | 4 | 35 | 262.5 | 140 | 0.386 | 202 | ||
3,809.85 € | 1 | 6 Arbeitstage | 10 | 35 | 50 | 4 | 35 | 262.5 | 140 | 0.386 | 202 | ||
3,918.68 € | 1 | 6 Arbeitstage | 10 | 36 | 50 | 4 | 35 | 262.5 | 140 | 0.386 | 202 | ||
4,027.54 € | 1 | 6 Arbeitstage | 10 | 37 | 50 | 4 | 35 | 262.5 | 140 | 0.386 | 202 | ||
4,136.40 € | 1 | 6 Arbeitstage | 10 | 38 | 50 | 4 | 35 | 262.5 | 140 | 0.386 | 202 | ||
4,245.23 € | 1 | 6 Arbeitstage | 10 | 39 | 50 | 4 | 35 | 262.5 | 140 | 0.386 | 202 | ||
4,354.09 € | 1 | 6 Arbeitstage | 10 | 40 | 50 | 4 | 35 | 262.5 | 140 | 0.386 | 202 | ||
4,462.95 € | 1 | 6 Arbeitstage | 10 | 41 | 50 | 4 | 35 | 262.5 | 140 | 0.386 | 202 | ||
4,571.78 € | 1 | 6 Arbeitstage | 10 | 42 | 50 | 4 | 35 | 262.5 | 140 | 0.386 | 202 | ||
4,680.65 € | 1 | 6 Arbeitstage | 10 | 43 | 50 | 4 | 35 | 262.5 | 140 | 0.386 | 202 | ||
4,789.51 € | 1 | 6 Arbeitstage | 10 | 44 | 50 | 4 | 35 | 262.5 | 140 | 0.386 | 202 | ||
4,898.37 € | 1 | 6 Arbeitstage | 10 | 45 | 50 | 4 | 35 | 262.5 | 140 | 0.386 | 202 | ||
5,007.20 € | 1 | 6 Arbeitstage | 10 | 46 | 50 | 4 | 35 | 262.5 | 140 | 0.386 | 202 | ||
5,116.06 € | 1 | 6 Arbeitstage | 10 | 47 | 50 | 4 | 35 | 262.5 | 140 | 0.386 | 202 | ||
5,224.92 € | 1 | 6 Arbeitstage | 10 | 48 | 50 | 4 | 35 | 262.5 | 140 | 0.386 | 202 | ||
5,333.75 € | 1 | 6 Arbeitstage | 10 | 49 | 50 | 4 | 35 | 262.5 | 140 | 0.386 | 202 | ||
5,442.62 € | 1 | 6 Arbeitstage | 10 | 50 | 50 | 4 | 35 | 262.5 | 140 | 0.386 | 202 | ||
5,551.48 € | 1 | 6 Arbeitstage | 10 | 51 | 50 | 4 | 35 | 262.5 | 140 | 0.386 | 202 | ||
5,660.31 € | 1 | 6 Arbeitstage | 10 | 52 | 50 | 4 | 35 | 262.5 | 140 | 0.386 | 202 | ||
5,769.17 € | 1 | 6 Arbeitstage | 10 | 53 | 50 | 4 | 35 | 262.5 | 140 | 0.386 | 202 | ||
5,878.03 € | 1 | 6 Arbeitstage | 10 | 54 | 50 | 4 | 35 | 262.5 | 140 | 0.386 | 202 | ||
5,986.89 € | 1 | 6 Arbeitstage | 10 | 55 | 50 | 4 | 35 | 262.5 | 140 | 0.386 | 202 | ||
6,095.72 € | 1 | 6 Arbeitstage | 10 | 56 | 50 | 4 | 35 | 262.5 | 140 | 0.386 | 202 | ||
6,204.58 € | 1 | 6 Arbeitstage | 10 | 57 | 50 | 4 | 35 | 262.5 | 140 | 0.386 | 202 | ||
6,313.45 € | 1 | 6 Arbeitstage | 10 | 58 | 50 | 4 | 35 | 262.5 | 140 | 0.386 | 202 | ||
6,422.28 € | 1 | 6 Arbeitstage | 10 | 59 | 50 | 4 | 35 | 262.5 | 140 | 0.386 | 202 | ||
6,531.14 € | 1 | 6 Arbeitstage | 10 | 60 | 50 | 4 | 35 | 262.5 | 140 | 0.386 | 202 | ||
6,640.00 € | 1 | 6 Arbeitstage | 10 | 61 | 50 | 4 | 35 | 262.5 | 140 | 0.386 | 202 | ||
6,748.83 € | 1 | 6 Arbeitstage | 10 | 62 | 50 | 4 | 35 | 262.5 | 140 | 0.386 | 202 | ||
6,857.69 € | 1 | 6 Arbeitstage | 10 | 63 | 50 | 4 | 35 | 262.5 | 140 | 0.386 | 202 | ||
6,966.55 € | 1 | 6 Arbeitstage | 10 | 64 | 50 | 4 | 35 | 262.5 | 140 | 0.386 | 202 | ||
7,075.42 € | 1 | 6 Arbeitstage | 10 | 65 | 50 | 4 | 35 | 262.5 | 140 | 0.386 | 202 | ||
7,184.25 € | 1 | 6 Arbeitstage | 10 | 66 | 50 | 4 | 35 | 262.5 | 140 | 0.386 | 202 | ||
7,293.11 € | 1 | 6 Arbeitstage | 10 | 67 | 50 | 4 | 35 | 262.5 | 140 | 0.386 | 202 | ||
7,401.97 € | 1 | 6 Arbeitstage | 10 | 68 | 50 | 4 | 35 | 262.5 | 140 | 0.386 | 202 | ||
7,510.80 € | 1 | 6 Arbeitstage | 10 | 69 | 50 | 4 | 35 | 262.5 | 140 | 0.386 | 202 | ||
7,619.66 € | 1 | 6 Arbeitstage | 10 | 70 | 50 | 4 | 35 | 262.5 | 140 | 0.386 | 202 | ||
7,728.52 € | 1 | 6 Arbeitstage | 10 | 71 | 50 | 4 | 35 | 262.5 | 140 | 0.386 | 202 | ||
7,837.35 € | 1 | 6 Arbeitstage | 10 | 72 | 50 | 4 | 35 | 262.5 | 140 | 0.386 | 202 | ||
7,946.22 € | 1 | 6 Arbeitstage | 10 | 73 | 50 | 4 | 35 | 262.5 | 140 | 0.386 | 202 | ||
8,055.08 € | 1 | 6 Arbeitstage | 10 | 74 | 50 | 4 | 35 | 262.5 | 140 | 0.386 | 202 | ||
8,163.94 € | 1 | 6 Arbeitstage | 10 | 75 | 50 | 4 | 35 | 262.5 | 140 | 0.386 | 202 | ||
8,272.77 € | 1 | 6 Arbeitstage | 10 | 76 | 50 | 4 | 35 | 262.5 | 140 | 0.386 | 202 | ||
8,381.63 € | 1 | 6 Arbeitstage | 10 | 77 | 50 | 4 | 35 | 262.5 | 140 | 0.386 | 202 | ||
8,490.49 € | 1 | 6 Arbeitstage | 10 | 78 | 50 | 4 | 35 | 262.5 | 140 | 0.386 | 202 | ||
8,599.32 € | 1 | 6 Arbeitstage | 10 | 79 | 50 | 4 | 35 | 262.5 | 140 | 0.386 | 202 | ||
8,708.18 € | 1 | 6 Arbeitstage | 10 | 80 | 50 | 4 | 35 | 262.5 | 140 | 0.386 | 202 |
Loading...
Rated Voltage | 600/1000 V | Shield | N/A | Properties | Ölbeständigkeit |
---|---|---|---|---|---|
Representative Standard | UL / CE / CSA (c-UL) | Sheath (outer coating) color | Schwarz | Grounding Wire | G/Y-farbig (grün/gelb) |
Sheath (outer coating) material | PVC-Beimischung mit geringer Adhäsionskraft/Ölabweisung | Insulation body materials | TPE-Beimischung | Freie Spanne, maximale Geschwindigkeit(m/s) | 10 |
Schieben, maximale Geschwindigkeit(m/s) | 5 | Maximale Beschleunigung(m/s²) | 80 | Hub | Bis zu 100 m |
Verdrillung(° (1 m)) | ±90 | Andere Standards | ISO-Klasse 2 (IPA): Reinraumkompatibel/CEI: Italienischer Standard/DESINA/NFPA 79-2012: Verwendung von UL-(AWM)-Kabel erlaubt | Andere Kabeleigenschaften | Schwer entflammbar und silikonfrei |
Hinweis 1 | Nennspannung: Uo/U (V) Uo = Spannung zwischen Leiter und Masse, U = Spannung zwischen jedem Leiter |
Konfigurieren
Basiseigenschaften
Overall Length(m)
Conductor Cross Section(mm2)
Number Of Cores(Core)
Finished outer diameter(mm)
Mindestbiegeradius bei Betrieb(mm)
Minimaler Biegeradius, wenn befestigt(mm)
Leiterwiderstand(Ω/km)
Zulässiger Strom-Referenzwert (30 °C)(A)
Filtern nach vsl. Lieferzeit
Optionale Eigenschaften