Lieferzeit |
|
---|
?* Informationen zur Lieferzeit und Preisen
LAPP
Jetzt konfigurieren
|
|
ab∗ : | 46,343.29 € |
---|---|
Minimum Lieferzeit : | 5 Arbeitstage |
*Stückpreis Standardkonfiguration
Warenzeichen |
---|
Artikelserie |
ab∗ |
Minimum Lieferzeit |
Overall Length(m) |
Specified Length(m) |
Conductor Cross Section(mm2) |
AWG size(AWG) |
Number Of Cores(Core) |
Finished outer diameter(mm) |
Rated Voltage |
Shield |
Properties |
Representative Standard |
Sheath (outer coating) color |
Grounding Wire |
Sheath (outer coating) material |
Insulation body materials |
Warenzeichen | LAPP |
---|---|
Artikelserie | |
ab∗ | 46,343.29 € *Stückpreis Standardkonfiguration Mengenrabatt |
Minimum Lieferzeit | 5 Arbeitstage |
Overall Length(m) | - |
Specified Length(m) | 250 |
Conductor Cross Section(mm2) | 150 |
AWG size(AWG) | - |
Number Of Cores(Core) | 4 |
Finished outer diameter(mm) | 62,2 |
Rated Voltage | - |
Shield | - |
Properties | - |
Representative Standard | - |
Sheath (outer coating) color | - |
Grounding Wire | - |
Sheath (outer coating) material | PVC (Polyvinylchlorid) |
Insulation body materials | - |
Loading...
Filtern nach:
Overall Length(m)
Specified Length(m)
Conductor Cross Section(mm2)
AWG size(AWG)
Number Of Cores(Core)
Finished outer diameter(mm)
Rated Voltage
Shield
Properties
Representative Standard
Sheath (outer coating) color
Grounding Wire
Sheath (outer coating) material
Insulation body materials
Marke
CAD Format