Lieferzeit |
|
---|
?* Informationen zur Lieferzeit und Preisen
Minimum Lieferzeit : | 5 Arbeitstage |
---|
Minimum Lieferzeit : | 5 Arbeitstage |
---|
Warenzeichen |
---|
Artikelserie |
ab∗ |
Minimum Lieferzeit : |
Overall Length(m) |
Conductor Cross Section(mm2) |
AWG size(AWG) |
Number Of Cores(Core) |
Logarithm |
Finished outer diameter(mm) |
Rated Voltage |
Shield |
Properties |
Representative Standard |
Sheath (outer coating) color |
Grounding Wire |
Sheath (outer coating) material |
Insulation body materials |
Warenzeichen | IGUS | IGUS |
---|---|---|
Artikelserie | ||
ab∗ | - | - |
Minimum Lieferzeit : | 5 Arbeitstage | 5 Arbeitstage |
Overall Length(m) | - | - |
Conductor Cross Section(mm2) | (4G4,0+(2x1,5)C)C | (4G4,0+(2x1,5)C)C |
AWG size(AWG) | - | - |
Number Of Cores(Core) | - | - |
Logarithm | - | - |
Finished outer diameter(mm) | 14.5 | 14.5 |
Rated Voltage | 600V | 600V |
Shield | - | - |
Properties | Ölbeständigkeit | - |
Representative Standard | - | UL / CE / CSA(c-UL) |
Sheath (outer coating) color | - | - |
Grounding Wire | - | - |
Sheath (outer coating) material | - | - |
Insulation body materials | - | - |
Loading...