Lieferzeit |
|
---|
?* Informationen zur Lieferzeit und Preisen
LAPP
ab∗ : | 47,288.29 € |
---|---|
Minimum Lieferzeit : | 5 Arbeitstage |
*Stückpreis Standardkonfiguration
Warenzeichen |
---|
Artikelserie |
ab∗ |
Minimum Lieferzeit : |
Overall Length(m) |
Specified Length(m) |
Conductor Cross Section(mm2) |
AWG size(AWG) |
Number Of Cores(Core) |
Finished outer diameter(mm) |
Rated Voltage |
Shield |
Properties |
Representative Standard |
Sheath (outer coating) color |
Grounding Wire |
Sheath (outer coating) material |
Insulation body materials |
Warenzeichen | LAPP |
---|---|
Artikelserie | |
ab∗ | 47,288.29 € *Stückpreis Standardkonfiguration Mengenrabatt |
Minimum Lieferzeit : | 5 Arbeitstage |
Overall Length(m) | - |
Specified Length(m) | 250 |
Conductor Cross Section(mm2) | 150 |
AWG size(AWG) | - |
Number Of Cores(Core) | 4 |
Finished outer diameter(mm) | 62,2 |
Rated Voltage | - |
Shield | - |
Properties | - |
Representative Standard | - |
Sheath (outer coating) color | - |
Grounding Wire | - |
Sheath (outer coating) material | PVC (Polyvinylchlorid) |
Insulation body materials | - |
Loading...