Flexible PVC pressure feeding / suction hose for piping in plant facilities and embedding in various machines
[Features]
・ T Ball series.
・ Highly transparent so fluid can be checked to provide peace-of-mind.
・ Resistance to crushing: Resistant to flattening and bending, eliminating concerns about fluid clogging.
・ Oil resistance and long service life: Better oil resistance and longer service life than TOYORON Hose.
・ Inner surface evenness: The inner surface of the hose is flat compared to the vacuum type, so there is less residue inside and the fluid change is easy.
・ Viewing of internal fluids: Highly transparent so fluid can be checked to provide peace-of-mind.
[Applications]
・ Ideal for hose piping parts with small bend radius or movable parts in machine equipment, etc.
Teilenummer
Hier finden Sie die Teilenummern
zu dem gesuchten Artikel
Teilenummer | Standard-Stückpreis | Mengenrabatt | Lieferzeit? | RoHS | Nenn-Innen-Ø d | Aussen - D (Ø) | Minimaler Biegeradius (mm) | Betriebstemperaturbereich (℃) | Betriebsdruckbereich (MPa) | Standardlänge (m) | Innen-Ø x Außen-Ø (mm) |
---|---|---|---|---|---|---|---|---|---|---|---|
166.64 € | Verfügbar |
Versand am selben Tag
Auf Lager | 10 | 6 | 11 | 25 | -5~60 | -0.1~0.8 | 100 | 6 × 11 | |
2.44 € | 7 Arbeitstage | 10 | 6 | 11 | 25 | -5~60 | -0.1~0.8 | 1 | 6 × 11 | ||
4.89 € | 7 Arbeitstage | 10 | 6 | 11 | 25 | -5~60 | -0.1~0.8 | 2 | 6 × 11 | ||
7.35 € | 7 Arbeitstage | 10 | 6 | 11 | 25 | -5~60 | -0.1~0.8 | 3 | 6 × 11 | ||
9.80 € | 7 Arbeitstage | 10 | 6 | 11 | 25 | -5~60 | -0.1~0.8 | 4 | 6 × 11 | ||
12.26 € | 7 Arbeitstage | 10 | 6 | 11 | 25 | -5~60 | -0.1~0.8 | 5 | 6 × 11 | ||
14.70 € | 7 Arbeitstage | 10 | 6 | 11 | 25 | -5~60 | -0.1~0.8 | 6 | 6 × 11 | ||
17.15 € | 7 Arbeitstage | 10 | 6 | 11 | 25 | -5~60 | -0.1~0.8 | 7 | 6 × 11 | ||
19.61 € | 7 Arbeitstage | 10 | 6 | 11 | 25 | -5~60 | -0.1~0.8 | 8 | 6 × 11 | ||
22.06 € | 7 Arbeitstage | 10 | 6 | 11 | 25 | -5~60 | -0.1~0.8 | 9 | 6 × 11 | ||
24.52 € | 7 Arbeitstage | 10 | 6 | 11 | 25 | -5~60 | -0.1~0.8 | 10 | 6 × 11 | ||
26.96 € | 7 Arbeitstage | 10 | 6 | 11 | 25 | -5~60 | -0.1~0.8 | 11 | 6 × 11 | ||
29.41 € | 7 Arbeitstage | 10 | 6 | 11 | 25 | -5~60 | -0.1~0.8 | 12 | 6 × 11 | ||
31.87 € | 7 Arbeitstage | 10 | 6 | 11 | 25 | -5~60 | -0.1~0.8 | 13 | 6 × 11 | ||
34.32 € | 7 Arbeitstage | 10 | 6 | 11 | 25 | -5~60 | -0.1~0.8 | 14 | 6 × 11 | ||
36.78 € | 7 Arbeitstage | 10 | 6 | 11 | 25 | -5~60 | -0.1~0.8 | 15 | 6 × 11 | ||
39.22 € | 7 Arbeitstage | 10 | 6 | 11 | 25 | -5~60 | -0.1~0.8 | 16 | 6 × 11 | ||
41.67 € | 7 Arbeitstage | 10 | 6 | 11 | 25 | -5~60 | -0.1~0.8 | 17 | 6 × 11 | ||
44.13 € | 7 Arbeitstage | 10 | 6 | 11 | 25 | -5~60 | -0.1~0.8 | 18 | 6 × 11 | ||
46.58 € | 7 Arbeitstage | 10 | 6 | 11 | 25 | -5~60 | -0.1~0.8 | 19 | 6 × 11 | ||
49.04 € | 7 Arbeitstage | 10 | 6 | 11 | 25 | -5~60 | -0.1~0.8 | 20 | 6 × 11 | ||
51.48 € | 7 Arbeitstage | 10 | 6 | 11 | 25 | -5~60 | -0.1~0.8 | 21 | 6 × 11 | ||
53.93 € | 7 Arbeitstage | 10 | 6 | 11 | 25 | -5~60 | -0.1~0.8 | 22 | 6 × 11 | ||
56.39 € | 7 Arbeitstage | 10 | 6 | 11 | 25 | -5~60 | -0.1~0.8 | 23 | 6 × 11 | ||
58.84 € | 7 Arbeitstage | 10 | 6 | 11 | 25 | -5~60 | -0.1~0.8 | 24 | 6 × 11 | ||
61.29 € | 7 Arbeitstage | 10 | 6 | 11 | 25 | -5~60 | -0.1~0.8 | 25 | 6 × 11 | ||
63.73 € | 7 Arbeitstage | 10 | 6 | 11 | 25 | -5~60 | -0.1~0.8 | 26 | 6 × 11 | ||
66.19 € | 7 Arbeitstage | 10 | 6 | 11 | 25 | -5~60 | -0.1~0.8 | 27 | 6 × 11 | ||
68.64 € | 7 Arbeitstage | 10 | 6 | 11 | 25 | -5~60 | -0.1~0.8 | 28 | 6 × 11 | ||
71.10 € | 7 Arbeitstage | 10 | 6 | 11 | 25 | -5~60 | -0.1~0.8 | 29 | 6 × 11 | ||
73.55 € | 7 Arbeitstage | 10 | 6 | 11 | 25 | -5~60 | -0.1~0.8 | 30 | 6 × 11 | ||
75.99 € | 7 Arbeitstage | 10 | 6 | 11 | 25 | -5~60 | -0.1~0.8 | 31 | 6 × 11 | ||
78.45 € | 7 Arbeitstage | 10 | 6 | 11 | 25 | -5~60 | -0.1~0.8 | 32 | 6 × 11 | ||
80.90 € | 7 Arbeitstage | 10 | 6 | 11 | 25 | -5~60 | -0.1~0.8 | 33 | 6 × 11 | ||
83.36 € | 7 Arbeitstage | 10 | 6 | 11 | 25 | -5~60 | -0.1~0.8 | 34 | 6 × 11 | ||
85.81 € | 7 Arbeitstage | 10 | 6 | 11 | 25 | -5~60 | -0.1~0.8 | 35 | 6 × 11 | ||
88.27 € | 7 Arbeitstage | 10 | 6 | 11 | 25 | -5~60 | -0.1~0.8 | 36 | 6 × 11 | ||
90.71 € | 7 Arbeitstage | 10 | 6 | 11 | 25 | -5~60 | -0.1~0.8 | 37 | 6 × 11 | ||
93.16 € | 7 Arbeitstage | 10 | 6 | 11 | 25 | -5~60 | -0.1~0.8 | 38 | 6 × 11 | ||
95.62 € | 7 Arbeitstage | 10 | 6 | 11 | 25 | -5~60 | -0.1~0.8 | 39 | 6 × 11 | ||
98.07 € | 7 Arbeitstage | 10 | 6 | 11 | 25 | -5~60 | -0.1~0.8 | 40 | 6 × 11 | ||
100.53 € | 7 Arbeitstage | 10 | 6 | 11 | 25 | -5~60 | -0.1~0.8 | 41 | 6 × 11 | ||
102.97 € | 7 Arbeitstage | 10 | 6 | 11 | 25 | -5~60 | -0.1~0.8 | 42 | 6 × 11 | ||
105.42 € | 7 Arbeitstage | 10 | 6 | 11 | 25 | -5~60 | -0.1~0.8 | 43 | 6 × 11 | ||
107.88 € | 7 Arbeitstage | 10 | 6 | 11 | 25 | -5~60 | -0.1~0.8 | 44 | 6 × 11 | ||
110.33 € | 7 Arbeitstage | 10 | 6 | 11 | 25 | -5~60 | -0.1~0.8 | 45 | 6 × 11 | ||
112.78 € | 7 Arbeitstage | 10 | 6 | 11 | 25 | -5~60 | -0.1~0.8 | 46 | 6 × 11 | ||
115.23 € | 7 Arbeitstage | 10 | 6 | 11 | 25 | -5~60 | -0.1~0.8 | 47 | 6 × 11 | ||
117.68 € | 7 Arbeitstage | 10 | 6 | 11 | 25 | -5~60 | -0.1~0.8 | 48 | 6 × 11 | ||
120.13 € | 7 Arbeitstage | 10 | 6 | 11 | 25 | -5~60 | -0.1~0.8 | 49 | 6 × 11 | ||
122.59 € | 7 Arbeitstage | 10 | 6 | 11 | 25 | -5~60 | -0.1~0.8 | 50 | 6 × 11 | ||
125.04 € | 7 Arbeitstage | 10 | 6 | 11 | 25 | -5~60 | -0.1~0.8 | 51 | 6 × 11 | ||
127.48 € | 7 Arbeitstage | 10 | 6 | 11 | 25 | -5~60 | -0.1~0.8 | 52 | 6 × 11 | ||
129.94 € | 7 Arbeitstage | 10 | 6 | 11 | 25 | -5~60 | -0.1~0.8 | 53 | 6 × 11 | ||
132.39 € | 7 Arbeitstage | 10 | 6 | 11 | 25 | -5~60 | -0.1~0.8 | 54 | 6 × 11 | ||
134.85 € | 7 Arbeitstage | 10 | 6 | 11 | 25 | -5~60 | -0.1~0.8 | 55 | 6 × 11 | ||
137.30 € | 7 Arbeitstage | 10 | 6 | 11 | 25 | -5~60 | -0.1~0.8 | 56 | 6 × 11 | ||
139.74 € | 7 Arbeitstage | 10 | 6 | 11 | 25 | -5~60 | -0.1~0.8 | 57 | 6 × 11 | ||
142.20 € | 7 Arbeitstage | 10 | 6 | 11 | 25 | -5~60 | -0.1~0.8 | 58 | 6 × 11 | ||
144.65 € | 7 Arbeitstage | 10 | 6 | 11 | 25 | -5~60 | -0.1~0.8 | 59 | 6 × 11 |
Loading...
Zulässige Flüssigkeit/Verwendung | Wasser / Chemikalien / Pulver (außer für Lebensmittel) / Luft / Öl (Mineralöl) | Nutzung Schneidservice | Verfügbar | Eigenschaften | Druckwiderstand / Ölbeständigkeit / Chemikalienbeständigkeit / Geringe Auswaschung / Transparenz / Flexibilität / Formstabilität / Vakuum |
---|---|---|---|---|---|
Schlauchmaterial | Vinylchlorid | Metallbefestigungen | NA | Farbe | Natur transparent |
KANAFLEX CORPORATION
Lieferzeit: 7 Arbeitstage
TOGAWA INDUSTRY
Lieferzeit: 6 Arbeitstage
Helfen Sie uns dabei, unsere Webseite noch weiter zu verbessern.
Bitte geben Sie uns Ihr Feedback zu unserem MISUMI e-Katalog.
Vielen Dank für Ihre Unterstützung.
Bitte nutzen Sie das Anfrageformular, wenn Sie eine umgehende Antwort von uns wünschen.