Profilschienenführungen / SHW / Material wählbar / breiter Wagen

Profilschienenführungen / SHW / Material wählbar / breiter Wagen
A structure with a wide rail width and low center of gravity. SHS It is advantageous when there are Mc moment requirements and is thin compared with.

[Features]
· A highly rigid LM guide that is capable of superior high speeds, maintenance-free over long periods of time, and having low noise due to the adoption of a ball retainer.
· The SHW, which has a structure with a width LM rail width and a low center of gravity, is ideal for use in locations where there are space limitations, and when there are MC moment rigidity requirements.
· Each of the rail rows has been arranged in an array at a 45° contact angle so that the rated load will be the same for all four directions (radial direction, reverse radial direction, horizontal direction) that act on the LM block, which allows it to be used in any position, and can be used for a wide range of application.
· The self-aligning capability achieved from the unique circular arched-groove front face combination (DF set) makes it possible to absorb the mounting error even when there is a preload incurred, and it is also capable of obtaining a smooth linear motion at a high accuracy.
· The ball retainers eliminate the mutual friction between the balls and holds the lubricant oil (agent) to achieve superior low-dust performance.

Teilenummer

Hier finden Sie die Teilenummern
zu dem gesuchten Artikel

Teilenummer
SHW12CA[1,​2,​3,​4,​5,​6,​7,​8,​9]C1M+[38-1230/1]LSPM
SHW12CA[1,​2,​3,​4,​5,​6,​7,​8,​9]M+[38-1230/1]LSPM
SHW12HR[1,​2,​3,​4,​5,​6,​7,​8,​9]C1M+[52-1230/1]LSPM
SHW12HR[1,​2,​3,​4,​5,​6,​7,​8,​9]M+[52-1230/1]LSPM
SHW14CA[1,​2,​3,​4,​5,​6,​7,​8,​9]C1M+[47-1430/1]LSPM
SHW14CA[1,​2,​3,​4,​5,​6,​7,​8,​9]M+[47-1430/1]LSPM
SHW14CR[1,​2,​3,​4,​5,​6,​7,​8,​9]C1M+[47-1430/1]LSPM
SHW14CR[1,​2,​3,​4,​5,​6,​7,​8,​9]M+[47-1430/1]LSPM
SHW17CA[1,​2,​3,​4,​5,​6,​7,​8,​9]C1M+[52-1800/1]LSPM
SHW17CA[1,​2,​3,​4,​5,​6,​7,​8,​9]M+[52-1800/1]LSPM
SHW21CA[1,​2,​3,​4,​5,​6,​7,​8,​9]+[60-3000/1]LSP
SHW21CA[1,​2,​3,​4,​5,​6,​7,​8,​9]C1+[60-3000/1]LSP
SHW21CR[1,​2,​3,​4,​5,​6,​7,​8,​9]+[60-3000/1]LSP
SHW21CR[1,​2,​3,​4,​5,​6,​7,​8,​9]C1+[60-3000/1]LSP
SHW27CA[1,​2,​3,​4,​5,​6,​7,​8,​9]+[74-3000/1]LSP
SHW27CA[1,​2,​3,​4,​5,​6,​7,​8,​9]C1+[74-3000/1]LSP
SHW27CR[1,​2,​3,​4,​5,​6,​7,​8,​9]+[74-3000/1]LSP
SHW27CR[1,​2,​3,​4,​5,​6,​7,​8,​9]C1+[74-3000/1]LSP
SHW35CA[1,​2,​3,​4,​5,​6,​7,​8,​9]+[108-3000/1]LSP
SHW35CA[1,​2,​3,​4,​5,​6,​7,​8,​9]C[0,​1]+[108-3000/1]LSP
SHW35CR[1,​2,​3,​4,​5,​6,​7,​8,​9]+[108-3000/1]LSP
SHW35CR[1,​2,​3,​4,​5,​6,​7,​8,​9]C[0,​1]+[108-3000/1]LSP
SHW50CA[1,​2,​3,​4,​5,​6,​7,​8,​9]+[142-3000/1]LSP
SHW50CA[1,​2,​3,​4,​5,​6,​7,​8,​9]C[0,​1]+[142-3000/1]LSP
SHW50CR[1,​2,​3,​4,​5,​6,​7,​8,​9]+[142-3000/1]LSP
SHW50CR[1,​2,​3,​4,​5,​6,​7,​8,​9]C[0,​1]+[142-3000/1]LSP
TeilenummerMindestbestellmengeMengenrabatt
Reguläre
Versanddauer
?
Schienenbreite W1
(mm)
Montagehöhe M
(mm)
Werkstoff Anzahl der mit der Achse kombinierten LM-Blöcke [L] Länge - Schiene
(mm)
Radiales Spiel Präzisionskategorie Nominale Teilenummer Dynamische Grundtragzahl C
(N)
Statische Grundtragzahl Co
(N)
[MA] Zulässiges statisches Moment
(Nm)
[MB] Zulässiges statisches Moment
(Nm)
[MC] Zulässiges statisches Moment
(Nm)
Abstand Befestigungsbohrung - Führungswagen (Breitrichtung)
(mm)
Abstand Befestigungsbohrung - Führungswagen (Längsrichtung)
(mm)
Durchmesser Befestigungsbohrung - Führungswagen Abstand Befestigungsbohrung - Schiene
(mm)
Durchmesser Befestigungsbohrung - Schiene Das Führungswagen-Außenmaß W
(mm)
Das Führungswagen-Außenmaß L
(mm)
Die Anzahl der Befestigungsbohrungen für Führungswagen
(Stück)
Montagebohrung, Einschraubtiefe
(mm)
Führungswagen-Maß L1
(mm)
1 14 Arbeitstage 1812Edelstahl1 ~ 938 ~ 1230Leichte VorspannungHochpräzisionsklasse124310566022.822.840.535182.5404.540374Durchgangsbohrung27
1 14 Arbeitstage 1812Edelstahl1 ~ 938 ~ 1230NormalHochpräzisionsklasse124310566022.822.840.535182.5404.540374Durchgangsbohrung27
1 14 Arbeitstage 1812Edelstahl1 ~ 952 ~ 1230Leichte VorspannungHochpräzisionsklasse125560868051.151.162.121243404.53050.443.540.4
1 14 Arbeitstage 1812Edelstahl1 ~ 952 ~ 1230NormalHochpräzisionsklasse125560868051.151.162.121243404.53050.443.540.4
1 14 Arbeitstage 2414Edelstahl1 ~ 947 ~ 1430Leichte VorspannungHochpräzisionsklasse147050898046.646.690.445243404.55045.54Durchgangsbohrung34
1 14 Arbeitstage 2414Edelstahl1 ~ 947 ~ 1430NormalHochpräzisionsklasse147050898046.646.690.445243404.55045.54Durchgangsbohrung34
1 14 Arbeitstage 2414Edelstahl1 ~ 947 ~ 1430Leichte VorspannungHochpräzisionsklasse147050898046.646.690.428153404.54045.54434 ~ 40.4
1 14 Arbeitstage 2414Edelstahl1 ~ 947 ~ 1430NormalHochpräzisionsklasse147050898046.646.690.428153404.54045.54434 ~ 40.4
1 14 Arbeitstage 3317Edelstahl1 ~ 952 ~ 1800Leichte VorspannungHochpräzisionsklasse1776501018059.159.116453264404.560516Durchgangsbohrung38
1 14 Arbeitstage 3317Edelstahl1 ~ 952 ~ 1800NormalHochpräzisionsklasse1776501018059.159.116453264404.560516Durchgangsbohrung38
1 14 Arbeitstage 3721Kohlenstoffstahl1 ~ 960 ~ 3000NormalHochpräzisionsklasse2182401280080.680.622960294.4504.568596Durchgangsbohrung43.6
1 14 Arbeitstage 3721Kohlenstoffstahl1 ~ 960 ~ 3000Leichte VorspannungHochpräzisionsklasse2182401280080.680.622960294.4504.568596Durchgangsbohrung43.6
1 14 Arbeitstage 3721Kohlenstoffstahl1 ~ 960 ~ 3000NormalHochpräzisionsklasse2182401280080.680.622931195504.554594643.6
1 14 Arbeitstage 3721Kohlenstoffstahl1 ~ 960 ~ 3000Leichte VorspannungHochpräzisionsklasse2182401280080.680.622931195504.554594643.6
1 14 Arbeitstage 4227Kohlenstoffstahl1 ~ 974 ~ 3000NormalHochpräzisionsklasse27160002270018718745570405.3604.58072.86Durchgangsbohrung56.6
1 14 Arbeitstage 4227Kohlenstoffstahl1 ~ 974 ~ 3000Leichte VorspannungHochpräzisionsklasse27160002270018718745570405.3604.58072.86Durchgangsbohrung56.6
1 14 Arbeitstage 4227Kohlenstoffstahl1 ~ 974 ~ 3000NormalHochpräzisionsklasse27160002270018718745546326604.56272.86656.6
1 14 Arbeitstage 4227Kohlenstoffstahl1 ~ 974 ~ 3000Leichte VorspannungHochpräzisionsklasse27160002270018718745546326604.56272.86656.6
1 14 Arbeitstage 6935Kohlenstoffstahl1 ~ 9108 ~ 3000NormalHochpräzisionsklasse35355004920060360316301076088071201076Durchgangsbohrung83
1 14 Arbeitstage 6935Kohlenstoffstahl1 ~ 9108 ~ 3000Leichte Vorspannung / Mittlere VorspannungHochpräzisionsklasse35355004920060360316301076088071201076Durchgangsbohrung83
1 14 Arbeitstage 6935Kohlenstoffstahl1 ~ 9108 ~ 3000NormalHochpräzisionsklasse3535500492006036031630765088071001076883
1 14 Arbeitstage 6935Kohlenstoffstahl1 ~ 9108 ~ 3000Leichte Vorspannung / Mittlere VorspannungHochpräzisionsklasse3535500492006036031630765088071001076883
1 14 Arbeitstage 9050Kohlenstoffstahl1 ~ 9142 ~ 3000NormalHochpräzisionsklasse5070200914001460146039701448088091621416Durchgangsbohrung107
1 14 Arbeitstage 9050Kohlenstoffstahl1 ~ 9142 ~ 3000Leichte Vorspannung / Mittlere VorspannungHochpräzisionsklasse5070200914001460146039701448088091621416Durchgangsbohrung107
1 14 Arbeitstage 9050Kohlenstoffstahl1 ~ 9142 ~ 3000NormalHochpräzisionsklasse5070200914001460146039701006510809100 ~ 13014168 ~ 15107
1 14 Arbeitstage 9050Kohlenstoffstahl1 ~ 9142 ~ 3000Leichte Vorspannung / Mittlere VorspannungHochpräzisionsklasse5070200914001460146039701006510809100 ~ 13014168 ~ 15107

Loading...

  1. 1

Grundlegende Informationen

Ausführung - Führungswagen Breit Ausführung - Schiene Breite Führungsschiene Kugelausrichtung 4-reihig, rund
Kugelkäfige Verfügbar Ausführung - Wälzkörper Kugel Set / Einzelteile Produktsatz
Befestigungsbohrung für Führungswagen Gewindebohrung

Technischer Support