Profilschienenführungen / HSR-M1-Modell

Profilschienenführungen / HSR-M1-Modell
High temperature specifications that can be used in maximum temperatures of 150°C, and the grease can also be used in high temperature environments. Has low rolling resistance fluctuation in response to changes in temperature and a dimension consistency treatment has been applied, which has provided excellent dimensional consistency.

[Features]
· Circulates the ball row using the end plate that is assembled in the LM block when the ball rotates the rotating side with four rows that have been precision ground into the LM block and LM rail.
· Each of the rail rows has been positioned at a 45° contact angle so that the rated load will be the same for all four directions (radial direction, reverse radial direction, horizontal direction) that act on the LM block, which allows it to be used from any position.
· The LM guide for use in high temperatures can be used in even higher temperatures of up to 150°C as a result of using a unique technology for the materials, heat treatment, and lubricant.
· Can now be used in temperatures of up to 150°C by using stainless steel end rails and end rails that utilize rubber materials for use in high temperatures.
· A dimensional consistency treatment has been applied to achieve excellent dimensional consistency after applying heat or cooling (may thermally expand under high temperatures).
· The LM block, LM rail, and balls all use stainless steel with excellent corrosion resistance, which is ideal for use in clean rooms.
· Uses a grease for use in high temperatures with limited rolling resistance fluctuations resulting from grease even when the temperature fluctuates from a normal temperature to a high temperature.

Teilenummer

Hier finden Sie die Teilenummern
zu dem gesuchten Artikel

Teilenummer
HSR15M1A[1,​2,​3,​4,​5,​6,​7,​8,​9]+[67-1240/1]L
HSR15M1A[1,​2,​3,​4,​5,​6,​7,​8,​9]C1+[67-1240/1]L
HSR15M1B[1,​2,​3,​4,​5,​6,​7,​8,​9]+[67-1240/1]L
HSR15M1B[1,​2,​3,​4,​5,​6,​7,​8,​9]C1+[67-1240/1]L
HSR15M1YR[1,​2,​3,​4,​5,​6,​7,​8,​9]+[67-1240/1]L
HSR15M1YR[1,​2,​3,​4,​5,​6,​7,​8,​9]C1+[67-1240/1]L
HSR20M1A[1,​2,​3,​4,​5,​6,​7,​8,​9]+[89-1500/1]L
HSR20M1A[1,​2,​3,​4,​5,​6,​7,​8,​9]C[0,​1]+[89-1500/1]L
HSR20M1B[1,​2,​3,​4,​5,​6,​7,​8,​9]+[89-1500/1]L
HSR20M1B[1,​2,​3,​4,​5,​6,​7,​8,​9]C[0,​1]+[89-1500/1]L
HSR20M1LA[1,​2,​3,​4,​5,​6,​7,​8,​9]+[105-1500/1]L
HSR20M1LA[1,​2,​3,​4,​5,​6,​7,​8,​9]C[0,​1]+[105-1500/1]L
HSR20M1LB[1,​2,​3,​4,​5,​6,​7,​8,​9]+[105-1500/1]L
HSR20M1LB[1,​2,​3,​4,​5,​6,​7,​8,​9]C[0,​1]+[105-1500/1]L
HSR20M1LR[1,​2,​3,​4,​5,​6,​7,​8,​9]+[105-1500/1]L
HSR20M1LR[1,​2,​3,​4,​5,​6,​7,​8,​9]C[0,​1]+[105-1500/1]L
HSR20M1R[1,​2,​3,​4,​5,​6,​7,​8,​9]+[89-1500/1]L
HSR20M1R[1,​2,​3,​4,​5,​6,​7,​8,​9]C[0,​1]+[89-1500/1]L
HSR20M1YR[1,​2,​3,​4,​5,​6,​7,​8,​9]+[89-1500/1]L
HSR20M1YR[1,​2,​3,​4,​5,​6,​7,​8,​9]C[0,​1]+[89-1500/1]L
HSR25M1A[1,​2,​3,​4,​5,​6,​7,​8,​9]+[97-1500/1]L
HSR25M1A[1,​2,​3,​4,​5,​6,​7,​8,​9]C[0,​1]+[97-1500/1]L
HSR25M1B[1,​2,​3,​4,​5,​6,​7,​8,​9]+[97-1500/1]L
HSR25M1B[1,​2,​3,​4,​5,​6,​7,​8,​9]C[0,​1]+[97-1500/1]L
HSR25M1LA[1,​2,​3,​4,​5,​6,​7,​8,​9]+[116-1500/1]L
HSR25M1LA[1,​2,​3,​4,​5,​6,​7,​8,​9]C[0,​1]+[116-1500/1]L
HSR25M1LB[1,​2,​3,​4,​5,​6,​7,​8,​9]+[116-1500/1]L
HSR25M1LB[1,​2,​3,​4,​5,​6,​7,​8,​9]C[0,​1]+[116-1500/1]L
HSR25M1LR[1,​2,​3,​4,​5,​6,​7,​8,​9]+[116-1500/1]L
HSR25M1LR[1,​2,​3,​4,​5,​6,​7,​8,​9]C[0,​1]+[116-1500/1]L
HSR25M1R[1,​2,​3,​4,​5,​6,​7,​8,​9]+[97-1500/1]L
HSR25M1R[1,​2,​3,​4,​5,​6,​7,​8,​9]C[0,​1]+[97-1500/1]L
HSR25M1YR[1,​2,​3,​4,​5,​6,​7,​8,​9]+[97-1500/1]L
HSR25M1YR[1,​2,​3,​4,​5,​6,​7,​8,​9]C[0,​1]+[97-1500/1]L
HSR30M1A[1,​2,​3,​4,​5,​6,​7,​8,​9]+[112-1500/1]L
HSR30M1A[1,​2,​3,​4,​5,​6,​7,​8,​9]C[0,​1]+[112-1500/1]L
HSR30M1B[1,​2,​3,​4,​5,​6,​7,​8,​9]+[112-1500/1]L
HSR30M1B[1,​2,​3,​4,​5,​6,​7,​8,​9]C[0,​1]+[112-1500/1]L
HSR30M1LA[1,​2,​3,​4,​5,​6,​7,​8,​9]+[135-1500/1]L
HSR30M1LA[1,​2,​3,​4,​5,​6,​7,​8,​9]C[0,​1]+[135-1500/1]L
HSR30M1LB[1,​2,​3,​4,​5,​6,​7,​8,​9]+[135-1500/1]L
HSR30M1LB[1,​2,​3,​4,​5,​6,​7,​8,​9]C[0,​1]+[135-1500/1]L
HSR30M1LR[1,​2,​3,​4,​5,​6,​7,​8,​9]+[135-1500/1]L
HSR30M1LR[1,​2,​3,​4,​5,​6,​7,​8,​9]C[0,​1]+[135-1500/1]L
HSR30M1R[1,​2,​3,​4,​5,​6,​7,​8,​9]+[112-1500/1]L
HSR30M1R[1,​2,​3,​4,​5,​6,​7,​8,​9]C[0,​1]+[112-1500/1]L
HSR30M1YR[1,​2,​3,​4,​5,​6,​7,​8,​9]+[112-1500/1]L
HSR30M1YR[1,​2,​3,​4,​5,​6,​7,​8,​9]C[0,​1]+[112-1500/1]L
TeilenummerMindestbestellmengeMengenrabatt
Reguläre
Versanddauer
?
Ausführung - Führungswagen Schienenbreite W1
(mm)
Montagehöhe M
(mm)
Anzahl der mit der Achse kombinierten LM-Blöcke [L] Länge - Schiene
(mm)
Radiales Spiel Präzisionskategorie Nominale Teilenummer Dynamische Grundtragzahl C
(N)
Statische Grundtragzahl Co
(N)
[MA] Zulässiges statisches Moment
(Nm)
[MB] Zulässiges statisches Moment
(Nm)
[MC] Zulässiges statisches Moment
(Nm)
Abstand Befestigungsbohrung - Führungswagen (Breitrichtung)
(mm)
Abstand Befestigungsbohrung - Führungswagen (Längsrichtung)
(mm)
Durchmesser Befestigungsbohrung - Führungswagen Abstand Befestigungsbohrung - Schiene
(mm)
Durchmesser Befestigungsbohrung - Schiene Das Führungswagen-Außenmaß W
(mm)
Das Führungswagen-Außenmaß L
(mm)
Befestigungsbohrung für Führungswagen Montagebohrung, Maß H
(φ)
Montagebohrung, Einschraubtiefe
(mm)
Führungswagen-Maß L1
(mm)
1 54 Arbeitstage Breit15241 ~ 967 ~ 1240NormalStandardklasse1583301350080.580.584.438304.5604.54759.6Gewindebohrung-Durchgangsbohrung38.8
1 54 Arbeitstage Breit15241 ~ 967 ~ 1240Leichte VorspannungStandardklasse1583301350080.580.584.438304.5604.54759.6Gewindebohrung-Durchgangsbohrung38.8
1 54 Arbeitstage Breit15241 ~ 967 ~ 1240NormalStandardklasse1583301350080.580.584.438304.5604.54759.6Bohrung4.5Durchgangsbohrung38.8
1 54 Arbeitstage Breit15241 ~ 967 ~ 1240Leichte VorspannungStandardklasse1583301350080.580.584.438304.5604.54759.6Bohrung4.5Durchgangsbohrung38.8
1 54 Arbeitstage Standard15281 ~ 967 ~ 1240NormalStandardklasse1583301350080.580.584.411.5184604.533.559.6Gewindebohrung-538.8
1 54 Arbeitstage Standard15281 ~ 967 ~ 1240Leichte VorspannungStandardklasse1583301350080.580.584.411.5184604.533.559.6Gewindebohrung-538.8
1 54 Arbeitstage Breit20301 ~ 989 ~ 1500NormalStandardklasse20138002380019019020153406604.56376Gewindebohrung-Durchgangsbohrung50.8
1 54 Arbeitstage Breit20301 ~ 989 ~ 1500Leichte Vorspannung / Mittlere VorspannungStandardklasse20138002380019019020153406604.56376Gewindebohrung-Durchgangsbohrung50.8
1 54 Arbeitstage Breit20301 ~ 989 ~ 1500NormalStandardklasse20138002380019019020153406604.56376Bohrung6Durchgangsbohrung50.8
1 54 Arbeitstage Breit20301 ~ 989 ~ 1500Leichte Vorspannung / Mittlere VorspannungStandardklasse20138002380019019020153406604.56376Bohrung6Durchgangsbohrung50.8
1 54 Arbeitstage Breit20301 ~ 9105 ~ 1500NormalStandardklasse20213003180032332327053406604.56392Gewindebohrung-Durchgangsbohrung66.8
1 54 Arbeitstage Breit20301 ~ 9105 ~ 1500Leichte Vorspannung / Mittlere VorspannungStandardklasse20213003180032332327053406604.56392Gewindebohrung-Durchgangsbohrung66.8
1 54 Arbeitstage Breit20301 ~ 9105 ~ 1500NormalStandardklasse20213003180032332327053406604.56392Bohrung6Durchgangsbohrung66.8
1 54 Arbeitstage Breit20301 ~ 9105 ~ 1500Leichte Vorspannung / Mittlere VorspannungStandardklasse20213003180032332327053406604.56392Bohrung6Durchgangsbohrung66.8
1 54 Arbeitstage Standard20301 ~ 9105 ~ 1500NormalStandardklasse20213003180032332327032505604.54492Gewindebohrung-666.8
1 54 Arbeitstage Standard20301 ~ 9105 ~ 1500Leichte Vorspannung / Mittlere VorspannungStandardklasse20213003180032332327032505604.54492Gewindebohrung-666.8
1 54 Arbeitstage Standard20301 ~ 989 ~ 1500NormalStandardklasse20138002380019019020132365604.54476Gewindebohrung-650.8
1 54 Arbeitstage Standard20301 ~ 989 ~ 1500Leichte Vorspannung / Mittlere VorspannungStandardklasse20138002380019019020132365604.54476Gewindebohrung-650.8
1 54 Arbeitstage Standard20301 ~ 989 ~ 1500NormalStandardklasse20138002380019019020111.5255604.543.576Gewindebohrung-650.8
1 54 Arbeitstage Standard20301 ~ 989 ~ 1500Leichte Vorspannung / Mittlere VorspannungStandardklasse20138002380019019020111.5255604.543.576Gewindebohrung-650.8
1 54 Arbeitstage Breit23361 ~ 997 ~ 1500NormalStandardklasse251990034400307307344574586077083.9Gewindebohrung-Durchgangsbohrung59.5
1 54 Arbeitstage Breit23361 ~ 997 ~ 1500Leichte Vorspannung / Mittlere VorspannungStandardklasse251990034400307307344574586077083.9Gewindebohrung-Durchgangsbohrung59.5
1 54 Arbeitstage Breit23361 ~ 997 ~ 1500NormalStandardklasse251990034400307307344574576077083.9Bohrung7Durchgangsbohrung59.5
1 54 Arbeitstage Breit23361 ~ 997 ~ 1500Leichte Vorspannung / Mittlere VorspannungStandardklasse251990034400307307344574576077083.9Bohrung7Durchgangsbohrung59.5
1 54 Arbeitstage Breit23361 ~ 9116 ~ 1500NormalStandardklasse2527200459005295294595745860770103Gewindebohrung-Durchgangsbohrung78.6
1 54 Arbeitstage Breit23361 ~ 9116 ~ 1500Leichte Vorspannung / Mittlere VorspannungStandardklasse2527200459005295294595745860770103Gewindebohrung-Durchgangsbohrung78.6
1 54 Arbeitstage Breit23361 ~ 9116 ~ 1500NormalStandardklasse2527200459005295294595745760770103Bohrung7Durchgangsbohrung78.6
1 54 Arbeitstage Breit23361 ~ 9116 ~ 1500Leichte Vorspannung / Mittlere VorspannungStandardklasse2527200459005295294595745760770103Bohrung7Durchgangsbohrung78.6
1 54 Arbeitstage Standard23401 ~ 9116 ~ 1500NormalStandardklasse2527200459005295294593550860748103Gewindebohrung-878.6
1 54 Arbeitstage Standard23401 ~ 9116 ~ 1500Leichte Vorspannung / Mittlere VorspannungStandardklasse2527200459005295294593550860748103Gewindebohrung-878.6
1 54 Arbeitstage Standard23401 ~ 997 ~ 1500NormalStandardklasse251990034400307307344353586074883.9Gewindebohrung-859.5
1 54 Arbeitstage Standard23401 ~ 997 ~ 1500Leichte Vorspannung / Mittlere VorspannungStandardklasse251990034400307307344353586074883.9Gewindebohrung-859.5
1 54 Arbeitstage Standard23401 ~ 997 ~ 1500NormalStandardklasse2519900344003073073441630660747.583.9Gewindebohrung-659.5
1 54 Arbeitstage Standard23401 ~ 997 ~ 1500Leichte Vorspannung / Mittlere VorspannungStandardklasse2519900344003073073441630660747.583.9Gewindebohrung-659.5
1 54 Arbeitstage Breit28421 ~ 9112 ~ 1500NormalStandardklasse3028000468005245245627252108099098.8Gewindebohrung-Durchgangsbohrung70.4
1 54 Arbeitstage Breit28421 ~ 9112 ~ 1500Leichte Vorspannung / Mittlere VorspannungStandardklasse3028000468005245245627252108099098.8Gewindebohrung-Durchgangsbohrung70.4
1 54 Arbeitstage Breit28421 ~ 9112 ~ 1500NormalStandardklasse302800046800524524562725298099098.8Bohrung9Durchgangsbohrung70.4
1 54 Arbeitstage Breit28421 ~ 9112 ~ 1500Leichte Vorspannung / Mittlere VorspannungStandardklasse302800046800524524562725298099098.8Bohrung9Durchgangsbohrung70.4
1 54 Arbeitstage Breit28421 ~ 9135 ~ 1500NormalStandardklasse30373006250088988975172521080990121.4Gewindebohrung-Durchgangsbohrung93
1 54 Arbeitstage Breit28421 ~ 9135 ~ 1500Leichte Vorspannung / Mittlere VorspannungStandardklasse30373006250088988975172521080990121.4Gewindebohrung-Durchgangsbohrung93
1 54 Arbeitstage Breit28421 ~ 9135 ~ 1500NormalStandardklasse3037300625008898897517252980990121.4Bohrung9Durchgangsbohrung93
1 54 Arbeitstage Breit28421 ~ 9135 ~ 1500Leichte Vorspannung / Mittlere VorspannungStandardklasse3037300625008898897517252980990121.4Bohrung9Durchgangsbohrung93
1 54 Arbeitstage Standard28451 ~ 9135 ~ 1500NormalStandardklasse3037300625008898897514060880960121.4Gewindebohrung-1093
1 54 Arbeitstage Standard28451 ~ 9135 ~ 1500Leichte Vorspannung / Mittlere VorspannungStandardklasse3037300625008898897514060880960121.4Gewindebohrung-1093
1 54 Arbeitstage Standard28451 ~ 9112 ~ 1500NormalStandardklasse302800046800524524562404088096098.8Gewindebohrung-1070.4
1 54 Arbeitstage Standard28451 ~ 9112 ~ 1500Leichte Vorspannung / Mittlere VorspannungStandardklasse302800046800524524562404088096098.8Gewindebohrung-1070.4
1 54 Arbeitstage Standard28451 ~ 9112 ~ 1500NormalStandardklasse3037300625005245245621640680959.598.8Gewindebohrung-970.4
1 54 Arbeitstage Standard28451 ~ 9112 ~ 1500Leichte Vorspannung / Mittlere VorspannungStandardklasse3037300625005245245621640680959.598.8Gewindebohrung-970.4

Loading...

  1. 1

Grundlegende Informationen

Ausführung - Schiene Standard Werkstoff Edelstahl Kugelausrichtung 4-reihig, rund
Kugelkäfige NA Schmiersystem Schmiermittelanwendung Ausführung - Wälzkörper Kugel
Set / Einzelteile Produktsatz Die Anzahl der Befestigungsbohrungen für Führungswagen(Stück) 4

Technischer Support