Profilschienenführungen / HRW / Material wählbar / breiter Wagen

Profilschienenführungen / HRW / Material wählbar / breiter Wagen
A structure with a wide rail width and low center of gravity. HSR It is advantageous when there are Mc moment requirements and is thin compared with.

[Features]
· Circulates the ball row using the end plate that is assembled in the LM block when the ball rotates the rotating side with four rows that have been precision ground into the LM block and LM rail.
· Compact heavy load: A high number of effective balls makes it possible to obtain high rigidity in all directions. Has a wide rail width and can adequately withstand moments with a single shaft.
There is a high rigidity in the horizontal direction and there is no need to for reinforcement such as horizontal pressing due to large secondary moments being incurred on the rail cross-section.
· The self-aligning capability achieved from the unique circular arched-groove front face combination (DF set) makes it possible to absorb the mounting error even when there is a preload incurred, and it is also capable of obtaining a smooth linear motion at a high accuracy.

Teilenummer

Hier finden Sie die Teilenummern
zu dem gesuchten Artikel

Teilenummer
HRW12LR[1,​2,​3,​4,​5,​6,​7,​8,​9]C1M+[38-1000/1]LHM
HRW12LR[1,​2,​3,​4,​5,​6,​7,​8,​9]M+[38-1000/1]LHM
HRW14LR[1,​2,​3,​4,​5,​6,​7,​8,​9]C1M+[47-1430/1]LHM
HRW14LR[1,​2,​3,​4,​5,​6,​7,​8,​9]M+[47-1430/1]LHM
HRW17CA[1,​2,​3,​4,​5,​6,​7,​8,​9]C1M+[64-800/1]LHM
HRW17CA[1,​2,​3,​4,​5,​6,​7,​8,​9]M+[64-800/1]LHM
HRW17CR[1,​2,​3,​4,​5,​6,​7,​8,​9]+[64-3000/1]LH
HRW17CR[1,​2,​3,​4,​5,​6,​7,​8,​9]C1+[64-3000/1]LH
HRW17CR[1,​2,​3,​4,​5,​6,​7,​8,​9]C1M+[64-800/1]LHM
HRW17CR[1,​2,​3,​4,​5,​6,​7,​8,​9]M+[64-800/1]LHM
HRW21CA[1,​2,​3,​4,​5,​6,​7,​8,​9]+[72-3000/1]LH
HRW21CA[1,​2,​3,​4,​5,​6,​7,​8,​9]C1+[72-3000/1]LH
HRW21CA[1,​2,​3,​4,​5,​6,​7,​8,​9]C1M+[72-1000/1]LHM
HRW21CA[1,​2,​3,​4,​5,​6,​7,​8,​9]M+[72-1000/1]LHM
HRW21CR[1,​2,​3,​4,​5,​6,​7,​8,​9]+[72-3000/1]LH
HRW21CR[1,​2,​3,​4,​5,​6,​7,​8,​9]C1+[72-3000/1]LH
HRW21CR[1,​2,​3,​4,​5,​6,​7,​8,​9]C1M+[72-1000/1]LHM
HRW21CR[1,​2,​3,​4,​5,​6,​7,​8,​9]M+[72-1000/1]LHM
HRW27CA[1,​2,​3,​4,​5,​6,​7,​8,​9]+[86-3000/1]LH
HRW27CA[1,​2,​3,​4,​5,​6,​7,​8,​9]C1+[86-3000/1]LH
HRW27CR[1,​2,​3,​4,​5,​6,​7,​8,​9]+[86-3000/1]LH
HRW27CR[1,​2,​3,​4,​5,​6,​7,​8,​9]C1+[86-3000/1]LH
HRW27CR[1,​2,​3,​4,​5,​6,​7,​8,​9]C1M+[86-1200/1]LHM
HRW27CR[1,​2,​3,​4,​5,​6,​7,​8,​9]M+[86-1200/1]LHM
HRW35CA[1,​2,​3,​4,​5,​6,​7,​8,​9]+[120-3000/1]LH
HRW35CA[1,​2,​3,​4,​5,​6,​7,​8,​9]C[0,​1]+[120-3000/1]LH
HRW35CA[1,​2,​3,​4,​5,​6,​7,​8,​9]C[0,​1]M+[120-2120/1]LHM
HRW35CA[1,​2,​3,​4,​5,​6,​7,​8,​9]M+[120-2120/1]LHM
HRW35CR[1,​2,​3,​4,​5,​6,​7,​8,​9]+[120-3000/1]LH
HRW35CR[1,​2,​3,​4,​5,​6,​7,​8,​9]C[0,​1]+[120-3000/1]LH
HRW35CR[1,​2,​3,​4,​5,​6,​7,​8,​9]C[0,​1]M+[120-2120/1]LHM
HRW35CR[1,​2,​3,​4,​5,​6,​7,​8,​9]M+[120-2120/1]LHM
HRW50CA[1,​2,​3,​4,​5,​6,​7,​8,​9]+[158-3000/1]LH
HRW50CA[1,​2,​3,​4,​5,​6,​7,​8,​9]C[0,​1]+[158-3000/1]LH
HRW50CR[1,​2,​3,​4,​5,​6,​7,​8,​9]+[158-3000/1]LH
HRW50CR[1,​2,​3,​4,​5,​6,​7,​8,​9]C[0,​1]+[158-3000/1]LH
HRW60CA[1,​2,​3,​4,​5,​6,​7,​8,​9]+[176-3000/1]LH
HRW60CA[1,​2,​3,​4,​5,​6,​7,​8,​9]C[0,​1]+[176-3000/1]LH
TeilenummerMindestbestellmengeMengenrabatt
Reguläre
Versanddauer
?
Schienenbreite W1
(mm)
Montagehöhe M
(mm)
Werkstoff Anzahl der mit der Achse kombinierten LM-Blöcke [L] Länge - Schiene
(mm)
Radiales Spiel Präzisionskategorie Nominale Teilenummer Schmiersystem Dynamische Grundtragzahl C
(N)
Statische Grundtragzahl Co
(N)
[MA] Zulässiges statisches Moment
(Nm)
[MB] Zulässiges statisches Moment
(Nm)
[MC] Zulässiges statisches Moment
(Nm)
Abstand Befestigungsbohrung - Führungswagen (Breitrichtung)
(mm)
Abstand Befestigungsbohrung - Führungswagen (Längsrichtung)
(mm)
Durchmesser Befestigungsbohrung - Führungswagen Abstand Befestigungsbohrung - Schiene
(mm)
Durchmesser Befestigungsbohrung - Schiene Das Führungswagen-Außenmaß W
(mm)
Das Führungswagen-Außenmaß L
(mm)
Die Anzahl der Befestigungsbohrungen für Führungswagen
(Stück)
Montagebohrung, Einschraubtiefe
(mm)
Führungswagen-Maß L1
(mm)
1 14 Arbeitstage 1812Edelstahl1 ~ 938 ~ 1000Leichte VorspannungHohe Güte12NA3290716026.2135121123404.5303743.527
1 14 Arbeitstage 1812Edelstahl1 ~ 938 ~ 1000NormalHohe Güte12NA3290716026.2135121123404.5303743.527
1 14 Arbeitstage 2414Edelstahl1 ~ 947 ~ 1430Leichte VorspannungHohe Güte14NA53801140049.92511228153404.54045.54432.9
1 14 Arbeitstage 2414Edelstahl1 ~ 947 ~ 1430NormalHohe Güte14NA53801140049.92511228153404.54045.54432.9
1 14 Arbeitstage 3317Edelstahl1 ~ 964 ~ 800Leichte VorspannungHohe Güte17Schmiermittelanwendung5530910046.446.414453263.3404.56050.86Durchgangsbohrung33.6
1 14 Arbeitstage 3317Edelstahl1 ~ 964 ~ 800NormalHohe Güte17Schmiermittelanwendung5530910046.446.414453263.3404.56050.86Durchgangsbohrung33.6
1 14 Arbeitstage 3317Kohlenstoffstahl1 ~ 964 ~ 3000NormalHohe Güte17Schmiermittelanwendung5530910046.446.414429154404.55050.84533.6
1 14 Arbeitstage 3317Kohlenstoffstahl1 ~ 964 ~ 3000Leichte VorspannungHohe Güte17Schmiermittelanwendung5530910046.446.414429154404.55050.84533.6
1 14 Arbeitstage 3317Edelstahl1 ~ 964 ~ 800Leichte VorspannungHohe Güte17Schmiermittelanwendung5530910046.446.414429154404.55050.84533.6
1 14 Arbeitstage 3317Edelstahl1 ~ 964 ~ 800NormalHohe Güte17Schmiermittelanwendung5530910046.446.414429154404.55050.84533.6
1 14 Arbeitstage 3721Kohlenstoffstahl1 ~ 972 ~ 3000NormalHohe Güte21Schmiermittelanwendung80201290078.478.421960294.4504.56858.86Durchgangsbohrung40
1 14 Arbeitstage 3721Kohlenstoffstahl1 ~ 972 ~ 3000Leichte VorspannungHohe Güte21Schmiermittelanwendung80201290078.478.421960294.4504.56858.86Durchgangsbohrung40
1 14 Arbeitstage 3721Edelstahl1 ~ 972 ~ 1000Leichte VorspannungHohe Güte21Schmiermittelanwendung80201290078.478.421960294.4504.56858.86Durchgangsbohrung40
1 14 Arbeitstage 3721Edelstahl1 ~ 972 ~ 1000NormalHohe Güte21Schmiermittelanwendung80201290078.478.421960294.4504.56858.86Durchgangsbohrung40
1 14 Arbeitstage 3721Kohlenstoffstahl1 ~ 972 ~ 3000NormalHohe Güte21Schmiermittelanwendung80201290078.478.421931195504.55458.84640
1 14 Arbeitstage 3721Kohlenstoffstahl1 ~ 972 ~ 3000Leichte VorspannungHohe Güte21Schmiermittelanwendung80201290078.478.421931195504.55458.84640
1 14 Arbeitstage 3721Edelstahl1 ~ 972 ~ 1000Leichte VorspannungHohe Güte21Schmiermittelanwendung80201290078.478.421931195504.55458.84640
1 14 Arbeitstage 3721Edelstahl1 ~ 972 ~ 1000NormalHohe Güte21Schmiermittelanwendung80201290078.478.421931195504.55458.84640
1 14 Arbeitstage 4227Kohlenstoffstahl1 ~ 986 ~ 3000NormalHohe Güte27Schmiermittelanwendung142002160016616642370405.3604.58072.86Durchgangsbohrung51.8
1 14 Arbeitstage 4227Kohlenstoffstahl1 ~ 986 ~ 3000Leichte VorspannungHohe Güte27Schmiermittelanwendung142002160016616642370405.3604.58072.86Durchgangsbohrung51.8
1 14 Arbeitstage 4227Kohlenstoffstahl1 ~ 986 ~ 3000NormalHohe Güte27Schmiermittelanwendung142002160016616642346326604.56272.86651.8
1 14 Arbeitstage 4227Kohlenstoffstahl1 ~ 986 ~ 3000Leichte VorspannungHohe Güte27Schmiermittelanwendung142002160016616642346326604.56272.86651.8
1 14 Arbeitstage 4227Edelstahl1 ~ 986 ~ 1200Leichte VorspannungHohe Güte27Schmiermittelanwendung142002160016616642346326604.56272.86651.8
1 14 Arbeitstage 4227Edelstahl1 ~ 986 ~ 1200NormalHohe Güte27Schmiermittelanwendung142002160016616642346326604.56272.86651.8
1 14 Arbeitstage 6935Kohlenstoffstahl1 ~ 9120 ~ 3000NormalHohe Güte35Schmiermittelanwendung33800486005595591590107606.8807120106.66Durchgangsbohrung77.6
1 14 Arbeitstage 6935Kohlenstoffstahl1 ~ 9120 ~ 3000Leichte Vorspannung / Mittlere VorspannungHohe Güte35Schmiermittelanwendung33800486005595591590107606.8807120106.66Durchgangsbohrung77.6
1 14 Arbeitstage 6935Edelstahl1 ~ 9120 ~ 2120Leichte Vorspannung / Mittlere VorspannungHohe Güte35Schmiermittelanwendung33800486005595591590107606.8807120106.66Durchgangsbohrung77.6
1 14 Arbeitstage 6935Edelstahl1 ~ 9120 ~ 2120NormalHohe Güte35Schmiermittelanwendung33800486005595591590107606.8807120106.66Durchgangsbohrung77.6
1 14 Arbeitstage 6935Kohlenstoffstahl1 ~ 9120 ~ 3000NormalHohe Güte35Schmiermittelanwendung3380048600559559159076508807100106.66877.6
1 14 Arbeitstage 6935Kohlenstoffstahl1 ~ 9120 ~ 3000Leichte Vorspannung / Mittlere VorspannungHohe Güte35Schmiermittelanwendung3380048600559559159076508807100106.66877.6
1 14 Arbeitstage 6935Edelstahl1 ~ 9120 ~ 2120Leichte Vorspannung / Mittlere VorspannungHohe Güte35Schmiermittelanwendung3380048600559559159076508807100106.66877.6
1 14 Arbeitstage 6935Edelstahl1 ~ 9120 ~ 2120NormalHohe Güte35Schmiermittelanwendung3380048600559559159076508807100106.66877.6
1 14 Arbeitstage 9050Kohlenstoffstahl1 ~ 9158 ~ 3000NormalHohe Güte50Schmiermittelanwendung6240086300132013203670144808.6809162140.56Durchgangsbohrung103.5
1 14 Arbeitstage 9050Kohlenstoffstahl1 ~ 9158 ~ 3000Leichte Vorspannung / Mittlere VorspannungHohe Güte50Schmiermittelanwendung6240086300132013203670144808.6809162140.56Durchgangsbohrung103.5
1 14 Arbeitstage 9050Kohlenstoffstahl1 ~ 9158 ~ 3000NormalHohe Güte50Schmiermittelanwendung62400863001320132036701006510809130140.5615103.5
1 14 Arbeitstage 9050Kohlenstoffstahl1 ~ 9158 ~ 3000Leichte Vorspannung / Mittlere VorspannungHohe Güte50Schmiermittelanwendung62400863001320132036701006510809130140.5615103.5
1 14 Arbeitstage 12060Kohlenstoffstahl1 ~ 9176 ~ 3000NormalHohe Güte60Schmiermittelanwendung803001090001880188061701808010.510511200158.96Durchgangsbohrung117.5
1 14 Arbeitstage 12060Kohlenstoffstahl1 ~ 9176 ~ 3000Leichte Vorspannung / Mittlere VorspannungHohe Güte60Schmiermittelanwendung803001090001880188061701808010.510511200158.96Durchgangsbohrung117.5

Loading...

  1. 1

Grundlegende Informationen

Ausführung - Führungswagen Breit Ausführung - Schiene Breite Führungsschiene Kugelausrichtung 4-reihig, rund
Kugelkäfige NA Ausführung - Wälzkörper Kugel Set / Einzelteile Produktsatz
Befestigungsbohrung für Führungswagen Gewindebohrung

Technischer Support