Teilenummer |
Standard-Stückpreis
| Mindestbestellmenge | Mengenrabatt | RoHS | Overall Length (m) | Conductor Cross Section (mm2) | Number Of Cores (Core) | Finished outer diameter (mm) | Mindestbiegeradius bei Betrieb (mm) | Minimaler Biegeradius, wenn befestigt (mm) | Leiterwiderstand (Ω/km) | Zulässiger Strom-Referenzwert (30 °C) (A) | |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
4,664.55 € | 1 | 6 Arbeitstage | 10 | 41 | 35 | 4 | 32.5 | 243.75 | 130 | 0.554 | 162 | ||
4,778.31 € | 1 | 6 Arbeitstage | 10 | 42 | 35 | 4 | 32.5 | 243.75 | 130 | 0.554 | 162 | ||
4,892.09 € | 1 | 6 Arbeitstage | 10 | 43 | 35 | 4 | 32.5 | 243.75 | 130 | 0.554 | 162 | ||
5,005.85 € | 1 | 6 Arbeitstage | 10 | 44 | 35 | 4 | 32.5 | 243.75 | 130 | 0.554 | 162 | ||
5,119.63 € | 1 | 6 Arbeitstage | 10 | 45 | 35 | 4 | 32.5 | 243.75 | 130 | 0.554 | 162 | ||
5,233.38 € | 1 | 6 Arbeitstage | 10 | 46 | 35 | 4 | 32.5 | 243.75 | 130 | 0.554 | 162 | ||
5,347.17 € | 1 | 6 Arbeitstage | 10 | 47 | 35 | 4 | 32.5 | 243.75 | 130 | 0.554 | 162 | ||
5,460.92 € | 1 | 6 Arbeitstage | 10 | 48 | 35 | 4 | 32.5 | 243.75 | 130 | 0.554 | 162 | ||
5,574.71 € | 1 | 6 Arbeitstage | 10 | 49 | 35 | 4 | 32.5 | 243.75 | 130 | 0.554 | 162 | ||
5,688.46 € | 1 | 6 Arbeitstage | 10 | 50 | 35 | 4 | 32.5 | 243.75 | 130 | 0.554 | 162 | ||
5,802.25 € | 1 | 6 Arbeitstage | 10 | 51 | 35 | 4 | 32.5 | 243.75 | 130 | 0.554 | 162 | ||
5,916.00 € | 1 | 6 Arbeitstage | 10 | 52 | 35 | 4 | 32.5 | 243.75 | 130 | 0.554 | 162 | ||
6,029.78 € | 1 | 6 Arbeitstage | 10 | 53 | 35 | 4 | 32.5 | 243.75 | 130 | 0.554 | 162 | ||
6,143.54 € | 1 | 6 Arbeitstage | 10 | 54 | 35 | 4 | 32.5 | 243.75 | 130 | 0.554 | 162 | ||
6,257.32 € | 1 | 6 Arbeitstage | 10 | 55 | 35 | 4 | 32.5 | 243.75 | 130 | 0.554 | 162 | ||
6,371.08 € | 1 | 6 Arbeitstage | 10 | 56 | 35 | 4 | 32.5 | 243.75 | 130 | 0.554 | 162 | ||
6,484.86 € | 1 | 6 Arbeitstage | 10 | 57 | 35 | 4 | 32.5 | 243.75 | 130 | 0.554 | 162 | ||
6,598.62 € | 1 | 6 Arbeitstage | 10 | 58 | 35 | 4 | 32.5 | 243.75 | 130 | 0.554 | 162 | ||
6,712.40 € | 1 | 6 Arbeitstage | 10 | 59 | 35 | 4 | 32.5 | 243.75 | 130 | 0.554 | 162 | ||
6,826.15 € | 1 | 6 Arbeitstage | 10 | 60 | 35 | 4 | 32.5 | 243.75 | 130 | 0.554 | 162 | ||
6,939.94 € | 1 | 6 Arbeitstage | 10 | 61 | 35 | 4 | 32.5 | 243.75 | 130 | 0.554 | 162 | ||
7,053.69 € | 1 | 6 Arbeitstage | 10 | 62 | 35 | 4 | 32.5 | 243.75 | 130 | 0.554 | 162 | ||
7,167.48 € | 1 | 6 Arbeitstage | 10 | 63 | 35 | 4 | 32.5 | 243.75 | 130 | 0.554 | 162 | ||
7,281.23 € | 1 | 6 Arbeitstage | 10 | 64 | 35 | 4 | 32.5 | 243.75 | 130 | 0.554 | 162 | ||
7,395.02 € | 1 | 6 Arbeitstage | 10 | 65 | 35 | 4 | 32.5 | 243.75 | 130 | 0.554 | 162 | ||
7,508.77 € | 1 | 6 Arbeitstage | 10 | 66 | 35 | 4 | 32.5 | 243.75 | 130 | 0.554 | 162 | ||
7,622.55 € | 1 | 6 Arbeitstage | 10 | 67 | 35 | 4 | 32.5 | 243.75 | 130 | 0.554 | 162 | ||
7,736.31 € | 1 | 6 Arbeitstage | 10 | 68 | 35 | 4 | 32.5 | 243.75 | 130 | 0.554 | 162 | ||
7,850.09 € | 1 | 6 Arbeitstage | 10 | 69 | 35 | 4 | 32.5 | 243.75 | 130 | 0.554 | 162 | ||
7,963.85 € | 1 | 6 Arbeitstage | 10 | 70 | 35 | 4 | 32.5 | 243.75 | 130 | 0.554 | 162 | ||
8,077.63 € | 1 | 6 Arbeitstage | 10 | 71 | 35 | 4 | 32.5 | 243.75 | 130 | 0.554 | 162 | ||
8,191.38 € | 1 | 6 Arbeitstage | 10 | 72 | 35 | 4 | 32.5 | 243.75 | 130 | 0.554 | 162 | ||
8,305.17 € | 1 | 6 Arbeitstage | 10 | 73 | 35 | 4 | 32.5 | 243.75 | 130 | 0.554 | 162 | ||
8,418.92 € | 1 | 6 Arbeitstage | 10 | 74 | 35 | 4 | 32.5 | 243.75 | 130 | 0.554 | 162 | ||
8,532.71 € | 1 | 6 Arbeitstage | 10 | 75 | 35 | 4 | 32.5 | 243.75 | 130 | 0.554 | 162 | ||
8,646.46 € | 1 | 6 Arbeitstage | 10 | 76 | 35 | 4 | 32.5 | 243.75 | 130 | 0.554 | 162 | ||
8,760.25 € | 1 | 6 Arbeitstage | 10 | 77 | 35 | 4 | 32.5 | 243.75 | 130 | 0.554 | 162 | ||
8,874.00 € | 1 | 6 Arbeitstage | 10 | 78 | 35 | 4 | 32.5 | 243.75 | 130 | 0.554 | 162 | ||
8,987.78 € | 1 | 6 Arbeitstage | 10 | 79 | 35 | 4 | 32.5 | 243.75 | 130 | 0.554 | 162 | ||
9,101.54 € | 1 | 6 Arbeitstage | 10 | 80 | 35 | 4 | 32.5 | 243.75 | 130 | 0.554 | 162 | ||
9,215.32 € | 1 | 6 Arbeitstage | 10 | 81 | 35 | 4 | 32.5 | 243.75 | 130 | 0.554 | 162 | ||
9,329.08 € | 1 | 6 Arbeitstage | 10 | 82 | 35 | 4 | 32.5 | 243.75 | 130 | 0.554 | 162 | ||
9,442.86 € | 1 | 6 Arbeitstage | 10 | 83 | 35 | 4 | 32.5 | 243.75 | 130 | 0.554 | 162 | ||
9,556.62 € | 1 | 6 Arbeitstage | 10 | 84 | 35 | 4 | 32.5 | 243.75 | 130 | 0.554 | 162 | ||
9,670.40 € | 1 | 6 Arbeitstage | 10 | 85 | 35 | 4 | 32.5 | 243.75 | 130 | 0.554 | 162 | ||
9,784.15 € | 1 | 6 Arbeitstage | 10 | 86 | 35 | 4 | 32.5 | 243.75 | 130 | 0.554 | 162 | ||
9,897.94 € | 1 | 6 Arbeitstage | 10 | 87 | 35 | 4 | 32.5 | 243.75 | 130 | 0.554 | 162 | ||
10,011.69 € | 1 | 6 Arbeitstage | 10 | 88 | 35 | 4 | 32.5 | 243.75 | 130 | 0.554 | 162 | ||
10,125.48 € | 1 | 6 Arbeitstage | 10 | 89 | 35 | 4 | 32.5 | 243.75 | 130 | 0.554 | 162 | ||
10,239.23 € | 1 | 6 Arbeitstage | 10 | 90 | 35 | 4 | 32.5 | 243.75 | 130 | 0.554 | 162 | ||
10,353.02 € | 1 | 6 Arbeitstage | 10 | 91 | 35 | 4 | 32.5 | 243.75 | 130 | 0.554 | 162 | ||
10,466.77 € | 1 | 6 Arbeitstage | 10 | 92 | 35 | 4 | 32.5 | 243.75 | 130 | 0.554 | 162 | ||
10,580.55 € | 1 | 6 Arbeitstage | 10 | 93 | 35 | 4 | 32.5 | 243.75 | 130 | 0.554 | 162 | ||
10,694.31 € | 1 | 6 Arbeitstage | 10 | 94 | 35 | 4 | 32.5 | 243.75 | 130 | 0.554 | 162 | ||
10,808.09 € | 1 | 6 Arbeitstage | 10 | 95 | 35 | 4 | 32.5 | 243.75 | 130 | 0.554 | 162 | ||
10,921.85 € | 1 | 6 Arbeitstage | 10 | 96 | 35 | 4 | 32.5 | 243.75 | 130 | 0.554 | 162 | ||
11,035.63 € | 1 | 6 Arbeitstage | 10 | 97 | 35 | 4 | 32.5 | 243.75 | 130 | 0.554 | 162 | ||
11,149.38 € | 1 | 6 Arbeitstage | 10 | 98 | 35 | 4 | 32.5 | 243.75 | 130 | 0.554 | 162 | ||
11,263.17 € | 1 | 6 Arbeitstage | 10 | 99 | 35 | 4 | 32.5 | 243.75 | 130 | 0.554 | 162 | ||
11,376.92 € | 1 | 6 Arbeitstage | 10 | 100 | 35 | 4 | 32.5 | 243.75 | 130 | 0.554 | 162 |
Loading...
Rated Voltage | 600/1000 V | Shield | Verzinnte Kupferlitze | Properties | Ölbeständigkeit |
---|---|---|---|---|---|
Representative Standard | UL / CE / CSA (c-UL) | Sheath (outer coating) color | Schwarz | Grounding Wire | G/Y-farbig (grün/gelb) |
Sheath (outer coating) material | PVC-Beimischung mit geringer Adhäsionskraft/Ölabweisung | Insulation body materials | TPE-Beimischung | Freie Spanne, maximale Geschwindigkeit(m/s) | 10 |
Schieben, maximale Geschwindigkeit(m/s) | 5 | Maximale Beschleunigung(m/s²) | 80 | Hub | Bis zu 100 m |
Andere Standards | ISO-Klasse 2 (IPA): Reinraumkompatibel/CEI: Italienischer Standard/NFPA 79-2012: Verwendung von UL-(AWM)-Kabel erlaubt | Andere Kabeleigenschaften | Schwer entflammbar und silikonfrei | Hinweis 1 | Nennspannung: Uo/U (V) Uo = Spannung zwischen Leiter und Masse, U = Spannung zwischen jedem Leiter |
Konfigurieren
Basiseigenschaften
Overall Length(m)
Conductor Cross Section(mm2)
Number Of Cores(Core)
Finished outer diameter(mm)
Mindestbiegeradius bei Betrieb(mm)
Minimaler Biegeradius, wenn befestigt(mm)
Leiterwiderstand(Ω/km)
Zulässiger Strom-Referenzwert (30 °C)(A)
Filtern nach vsl. Lieferzeit
Optionale Eigenschaften