Teilenummer
Hier finden Sie die Teilenummern
zu dem gesuchten Artikel
3D Vorschau nicht verfügbar, da noch keine Teilenummer generiert wurde.
Teilenummer
|
---|
EPN-L1-[40-150/0.01] |
EPN-L1.1-[40-150/0.01] |
EPN-L1.2-[40-150/0.01] |
EPN-L1.3-[40-150/0.01] |
EPN-L1.4-[40-150/0.01] |
EPN-L1.5-[40-200/0.01] |
EPN-L1.6-[40-200/0.01] |
EPN-L1.7-[40-200/0.01] |
EPN-L1.8-[40-200/0.01] |
EPN-L1.9-[40-200/0.01] |
EPN-L2-[40-400/0.01] |
EPN-L2.1-[40-300/0.01] |
EPN-L2.2-[40-300/0.01] |
EPN-L2.3-[40-300/0.01] |
EPN-L2.4-[40-300/0.01] |
EPN-L2.5-[40-400/0.01] |
EPN-L2.6-[40-300/0.01] |
EPN-L2.7-[40-300/0.01] |
EPN-L2.8-[40-300/0.01] |
EPN-L2.9-[40-300/0.01] |
EPN-L3-[40-500/0.01] |
EPN-L3.1-[40-400/0.01] |
EPN-L3.2-[40-400/0.01] |
EPN-L3.3-[40-400/0.01] |
EPN-L3.4-[40-400/0.01] |
EPN-L3.5-[40-500/0.01] |
EPN-L3.6-[40-400/0.01] |
EPN-L3.7-[40-400/0.01] |
EPN-L3.8-[40-400/0.01] |
EPN-L3.9-[40-400/0.01] |
EPN-L4-[40-400/0.01] |
EPN-L4.1-[40-400/0.01] |
EPN-L4.2-[40-400/0.01] |
EPN-L4.3-[40-400/0.01] |
EPN-L4.4-[40-400/0.01] |
EPN-L4.5-[40-400/0.01] |
EPN-L4.6-[40-400/0.01] |
EPN-L4.7-[40-400/0.01] |
EPN-L4.8-[40-400/0.01] |
EPN-L4.9-[40-400/0.01] |
EPN-L5-[40-500/0.01] |
EPN-L5.1-[40-400/0.01] |
EPN-L5.2-[40-400/0.01] |
EPN-L5.3-[40-400/0.01] |
EPN-L5.4-[40-400/0.01] |
EPN-L5.5-[40-500/0.01] |
EPN-L5.6-[40-400/0.01] |
EPN-L5.7-[40-400/0.01] |
EPN-L5.8-[40-400/0.01] |
EPN-L5.9-[40-400/0.01] |
EPN-L6-[40-500/0.01] |
EPN-L6.1-[40-400/0.01] |
EPN-L6.2-[40-400/0.01] |
EPN-L6.3-[40-400/0.01] |
EPN-L6.4-[40-400/0.01] |
EPN-L6.5-[40-500/0.01] |
EPN-L7-[40-500/0.01] |
EPN-L8-[40-500/0.01] |
EPN-L10-[40-500/0.01] |
EPN-L12-[40-500/0.01] |
Teilenummer |
Standard-Stückpreis
| Mindestbestellmenge | Mengenrabatt | RoHS | Toleranz des Wellendurchmessers (Referenztoleranz) | L-Maßtoleranz (Referenztoleranz) | Dicke des Kopfes | D/P (Wellendurchmesser) (mm) | L (L-Maß) (mm) | |
---|---|---|---|---|---|---|---|---|---|---|
- | 1 | 13 Arbeitstage | 10 | -0.01/-0.02 | +0.02/0 | 4mm(T4) | 1 | 40 ~ 150 | ||
- | 1 | 13 Arbeitstage | 10 | -0.01/-0.02 | +0.02/0 | 4mm(T4) | 1.1 | 40 ~ 150 | ||
- | 1 | 13 Arbeitstage | 10 | -0.01/-0.02 | +0.02/0 | 4mm(T4) | 1.2 | 40 ~ 150 | ||
- | 1 | 13 Arbeitstage | 10 | -0.01/-0.02 | +0.02/0 | 4mm(T4) | 1.3 | 40 ~ 150 | ||
- | 1 | 13 Arbeitstage | 10 | -0.01/-0.02 | +0.02/0 | 4mm(T4) | 1.4 | 40 ~ 150 | ||
- | 1 | 13 Arbeitstage | 10 | -0.01/-0.02 | +0.02/0 or +0.05/0 | 4mm(T4) | 1.5 | 40 ~ 200 | ||
- | 1 | 13 Arbeitstage | 10 | -0.01/-0.02 | +0.02/0 or +0.05/0 | 4mm(T4) | 1.6 | 40 ~ 200 | ||
- | 1 | 13 Arbeitstage | 10 | -0.01/-0.02 | +0.02/0 or +0.05/0 | 4mm(T4) | 1.7 | 40 ~ 200 | ||
- | 1 | 13 Arbeitstage | 10 | -0.01/-0.02 | +0.02/0 or +0.05/0 | 4mm(T4) | 1.8 | 40 ~ 200 | ||
- | 1 | 13 Arbeitstage | 10 | -0.01/-0.02 | +0.02/0 or +0.05/0 | 4mm(T4) | 1.9 | 40 ~ 200 | ||
- | 1 | 13 Arbeitstage | 10 | -0.01/-0.02 | +0.02/0 or +0.05/0 | 4mm(T4) | 2 | 40 ~ 400 | ||
- | 1 | 13 Arbeitstage | 10 | -0.01/-0.02 | +0.02/0 or +0.05/0 | 4mm(T4) | 2.1 | 40 ~ 300 | ||
- | 1 | 13 Arbeitstage | 10 | -0.01/-0.02 | +0.02/0 or +0.05/0 | 4mm(T4) | 2.2 | 40 ~ 300 | ||
- | 1 | 13 Arbeitstage | 10 | -0.01/-0.02 | +0.02/0 or +0.05/0 | 4mm(T4) | 2.3 | 40 ~ 300 | ||
- | 1 | 13 Arbeitstage | 10 | -0.01/-0.02 | +0.02/0 or +0.05/0 | 4mm(T4) | 2.4 | 40 ~ 300 | ||
- | 1 | 8 Arbeitstage | 10 | -0.01/-0.02 | +0.02/0 or +0.05/0 | 4mm(T4) | 2.5 | 40 ~ 400 | ||
- | 1 | 13 Arbeitstage | 10 | -0.01/-0.02 | +0.02/0 or +0.05/0 | 4mm(T4) | 2.6 | 40 ~ 300 | ||
- | 1 | 13 Arbeitstage | 10 | -0.01/-0.02 | +0.02/0 or +0.05/0 | 4mm(T4) | 2.7 | 40 ~ 300 | ||
- | 1 | 13 Arbeitstage | 10 | -0.01/-0.02 | +0.02/0 or +0.05/0 | 4mm(T4) | 2.8 | 40 ~ 300 | ||
- | 1 | 13 Arbeitstage | 10 | -0.01/-0.02 | +0.02/0 or +0.05/0 | 4mm(T4) | 2.9 | 40 ~ 300 | ||
- | 1 | 8 Arbeitstage | 10 | -0.01/-0.02 | +0.02/0 or +0.05/0 | 4mm(T4) | 3 | 40 ~ 500 | ||
- | 1 | 13 Arbeitstage | 10 | -0.01/-0.02 | +0.02/0 or +0.05/0 | 4mm(T4) | 3.1 | 40 ~ 400 | ||
- | 1 | 13 Arbeitstage | 10 | -0.01/-0.02 | +0.02/0 or +0.05/0 | 4mm(T4) | 3.2 | 40 ~ 400 | ||
- | 1 | 13 Arbeitstage | 10 | -0.01/-0.02 | +0.02/0 or +0.05/0 | 4mm(T4) | 3.3 | 40 ~ 400 | ||
- | 1 | 13 Arbeitstage | 10 | -0.01/-0.02 | +0.02/0 or +0.05/0 | 4mm(T4) | 3.4 | 40 ~ 400 | ||
- | 1 | 8 Arbeitstage | 10 | -0.01/-0.02 | +0.02/0 or +0.05/0 | 4mm(T4) | 3.5 | 40 ~ 500 | ||
- | 1 | 13 Arbeitstage | 10 | -0.01/-0.02 | +0.02/0 or +0.05/0 | 4mm(T4) | 3.6 | 40 ~ 400 | ||
- | 1 | 13 Arbeitstage | 10 | -0.01/-0.02 | +0.02/0 or +0.05/0 | 4mm(T4) | 3.7 | 40 ~ 400 | ||
- | 1 | 13 Arbeitstage | 10 | -0.01/-0.02 | +0.02/0 or +0.05/0 | 4mm(T4) | 3.8 | 40 ~ 400 | ||
- | 1 | 13 Arbeitstage | 10 | -0.01/-0.02 | +0.02/0 or +0.05/0 | 4mm(T4) | 3.9 | 40 ~ 400 | ||
- | 1 | 8 Arbeitstage | 10 | -0.01/-0.02 | +0.02/0 or +0.05/0 | 4mm(T4) | 4 | 40 ~ 400 | ||
- | 1 | 13 Arbeitstage | 10 | -0.01/-0.02 | +0.02/0 or +0.05/0 | 4mm(T4) | 4.1 | 40 ~ 400 | ||
- | 1 | 13 Arbeitstage | 10 | -0.01/-0.02 | +0.02/0 or +0.05/0 | 4mm(T4) | 4.2 | 40 ~ 400 | ||
- | 1 | 13 Arbeitstage | 10 | -0.01/-0.02 | +0.02/0 or +0.05/0 | 4mm(T4) | 4.3 | 40 ~ 400 | ||
- | 1 | 13 Arbeitstage | 10 | -0.01/-0.02 | +0.02/0 or +0.05/0 | 4mm(T4) | 4.4 | 40 ~ 400 | ||
- | 1 | 8 Arbeitstage | 10 | -0.01/-0.02 | +0.02/0 or +0.05/0 | 4mm(T4) | 4.5 | 40 ~ 400 | ||
- | 1 | 13 Arbeitstage | 10 | -0.01/-0.02 | +0.02/0 or +0.05/0 | 4mm(T4) | 4.6 | 40 ~ 400 | ||
- | 1 | 13 Arbeitstage | 10 | -0.01/-0.02 | +0.02/0 or +0.05/0 | 4mm(T4) | 4.7 | 40 ~ 400 | ||
- | 1 | 13 Arbeitstage | 10 | -0.01/-0.02 | +0.02/0 or +0.05/0 | 4mm(T4) | 4.8 | 40 ~ 400 | ||
- | 1 | 13 Arbeitstage | 10 | -0.01/-0.02 | +0.02/0 or +0.05/0 | 4mm(T4) | 4.9 | 40 ~ 400 | ||
- | 1 | 8 Arbeitstage | 10 | -0.01/-0.02 | +0.02/0 or +0.05/0 | 4mm(T4) | 5 | 40 ~ 500 | ||
- | 1 | 13 Arbeitstage | 10 | -0.01/-0.02 | +0.02/0 or +0.05/0 | 4mm(T4) | 5.1 | 40 ~ 400 | ||
- | 1 | 13 Arbeitstage | 10 | -0.01/-0.02 | +0.02/0 or +0.05/0 | 4mm(T4) | 5.2 | 40 ~ 400 | ||
- | 1 | 13 Arbeitstage | 10 | -0.01/-0.02 | +0.02/0 or +0.05/0 | 4mm(T4) | 5.3 | 40 ~ 400 | ||
- | 1 | 13 Arbeitstage | 10 | -0.01/-0.02 | +0.02/0 or +0.05/0 | 4mm(T4) | 5.4 | 40 ~ 400 | ||
- | 1 | 8 Arbeitstage | 10 | -0.01/-0.02 | +0.02/0 or +0.05/0 | 4mm(T4) | 5.5 | 40 ~ 500 | ||
- | 1 | 13 Arbeitstage | 10 | -0.01/-0.02 | +0.02/0 or +0.05/0 | 4mm(T4) | 5.6 | 40 ~ 400 | ||
- | 1 | 13 Arbeitstage | 10 | -0.01/-0.02 | +0.02/0 or +0.05/0 | 4mm(T4) | 5.7 | 40 ~ 400 | ||
- | 1 | 13 Arbeitstage | 10 | -0.01/-0.02 | +0.02/0 or +0.05/0 | 4mm(T4) | 5.8 | 40 ~ 400 | ||
- | 1 | 13 Arbeitstage | 10 | -0.01/-0.02 | +0.02/0 or +0.05/0 | 4mm(T4) | 5.9 | 40 ~ 400 | ||
- | 1 | 8 Arbeitstage | 10 | -0.01/-0.02 | +0.02/0 or +0.05/0 | 4mm(T4) | 6 | 40 ~ 500 | ||
- | 1 | 13 Arbeitstage | 10 | -0.01/-0.02 | +0.02/0 or +0.05/0 | 4mm(T4) | 6.1 | 40 ~ 400 | ||
- | 1 | 13 Arbeitstage | 10 | -0.01/-0.02 | +0.02/0 or +0.05/0 | 4mm(T4) | 6.2 | 40 ~ 400 | ||
- | 1 | 13 Arbeitstage | 10 | -0.01/-0.02 | +0.02/0 or +0.05/0 | 4mm(T4) | 6.3 | 40 ~ 400 | ||
- | 1 | 13 Arbeitstage | 10 | -0.01/-0.02 | +0.02/0 or +0.05/0 | 4mm(T4) | 6.4 | 40 ~ 400 | ||
- | 1 | 8 Arbeitstage | 10 | -0.01/-0.02 | +0.02/0 or +0.05/0 | 4mm(T4) | 6.5 | 40 ~ 500 | ||
- | 1 | 8 Arbeitstage | 10 | -0.01/-0.02 | +0.02/0 or +0.05/0 | 4mm(T4) | 7 | 40 ~ 500 | ||
- | 1 | 8 Arbeitstage | 10 | -0.01/-0.02 | +0.02/0 or +0.05/0 | 4mm(T4) | 8 | 40 ~ 500 | ||
- | 1 | 8 Arbeitstage | 10 | -0.01/-0.02 | +0.02/0 or +0.05/0 | 4mm(T4) | 10 | 40 ~ 500 | ||
- | 1 | 8 Arbeitstage | 10 | -0.01/-0.02 | +0.02/0 or +0.05/0 | 4mm(T4) | 12 | 40 ~ 500 |
Loading...
Typ der Form | Keine Bearbeitung der Spitze | Material | SKD61 | Oberflächenbehandlung | nitriert |
---|---|---|---|---|---|
Form der Spitze | Nein | Form der Gasabgabe | Nein | Ausführung mit Gravur | Nein |
Anzahl der Gravurzeichen | Nein | Technischer Standard | JIS |
Konfigurieren
Basiseigenschaften
Toleranz des Wellendurchmessers (Referenztoleranz)
L-Maßtoleranz (Referenztoleranz)
D/P (Wellendurchmesser)(mm)
L (L-Maß)(mm)
Ausführung
Dicke des Kopfes
Filtern nach CAD Format
Filtern nach vsl. Lieferzeit
Optionale Eigenschaften